KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
Work Logs Found: 631
Category Work Time: 1914 Hours
 Date
Hours
Work Log Summary

Details

 10-31-2021
3.00
Reinstallation of the elevator push rod and autopi
Details
       

 10-30-2021
9.00
Electrical wiring, mount VPX-Pro and rear ski rack
Details
       

 10-29-2021
1.00
Strip and crimp the RG400 coaial cable for WAAS an

 10-25-2021
1.00
Fit upper bracing for ski rack

 10-24-2021
4.00
Route Coaxial cable run for rear WAAS antenna
Details

 10-23-2021
1.50
Strip and crimp connectors for both sides of the t
Details

 10-18-2021
1.50
Strip and crimp Communication radio antenna coax c
Details

 10-17-2021
1.50
ADAHARS and Magnometer installation
Details

 10-16-2021
11.00
Rivet on the rear fuselage top skin
Details
       

 10-15-2021
2.00
Rivet on rear bulkhead to top rear skin

 10-14-2021
1.50


 10-12-2021
1.50
Pulled coax cable to GPS and Com radio antenna
Details

 10-11-2021
1.50
Prep the rear fuselage for riveting on the top ski
Details
     

 10-07-2021
2.00
Relocate the flap switch
Details
     

 10-06-2021
1.00
Flap switch mounting and linkage for flap position

 10-04-2021
2.00
Pulled main electrical run from EFIS to forward fi
Details
       

 10-03-2021
4.50
Firewall insulation and heat shield
Details
       

 10-02-2021
9.00
Cabin lighting, wire protection, and clean up
Details
       

 10-01-2021
1.50
signal line from grip to bagage compartment
Details

 09-30-2021
1.00
Pinned and wired both localized ground lines for g

 09-29-2021
1.00
Inventory the parts from the firewall forward kit

 09-28-2021
1.50
Wiring in cockpit lighting
Details

 09-27-2021
2.00
Secure wire runs from pilot and co-pilot stick swi
Details
       

 09-26-2021
2.00
Pinned the front grip switches for hat switch trim

 09-22-2021
1.75
Wiring on Front seat heat.
Details

 09-21-2021
2.00
Wiring for seat heat
Details
       

 09-20-2021
1.50
Work on securing the wiring on the flap motor and
     

 09-19-2021
2.50
connectors for flap motor and position sensor
Details
       

 09-18-2021
3.00
Pinning connector for roll trim system and securin
Details
     

 09-18-2021
2.50
Fabricated the flap position sensor mount and conn
Details
     

 09-17-2021
1.75
pulling and securing wires

 09-14-2021
3.00
Work on wiring and wire rash protection covers

 09-13-2021
3.50
Extending the pitch servo wires 20"
Details
     

 09-04-2021
6.50
nutplates for floor access
Details

 09-02-2021
2.00
Work on nutplates for floor access

 09-01-2021
1.50
Wrapped rear control stick with vinyl and worked o

 08-31-2021
1.00
Nutplates for removable access to fuselage floor
Details

 08-30-2021
2.50
Plate nuts for removable floor
Details

 08-25-2021
1.50
Started drilling and setting nutplates to make the
Details

 08-21-2021
11.00
Wiring for various components as well as air lines
Details
       

 08-20-2021
3.00
Worked on wiring for seat heat switches
Details
     

 08-14-2021
6.50
working on wiring and rubber grommets through fuse
Details
     

 08-12-2021
1.50
Wiring and cut hole for USB power plug position

 08-11-2021
2.50
Cover plates and forward stick control
Details
       

 08-10-2021
3.00
Run wiring for pilot headphone jack to right fusel
Details
       

 08-09-2021
2.00
Run co-pilot head phone jacks
Details

 08-07-2021
8.50
Wiring for rear of fuselage and left side
Details

 08-06-2021
2.00
Wring run to rear fuselage
Details

 08-03-2021
12.50
De-pinning, pulling wires, re-pinning
Details
       

 08-02-2021
2.50
De-pinning connectors and marking wire to pull lin
Details

 07-19-2021
1.00
Drilled the wirelines for the avionics.

 07-17-2021
12.00
Instation of various avionics components
Details
       

 07-11-2021
4.00
Mounting tray and work on switch plate and wiring
Details
       

 07-10-2021
7.50
installed avionics onto tray and drilled and inst
Details
       

 06-29-2021
1.50
drilled and mounted the soft plastic canopy rail p
Details

 06-26-2021
4.00
more finish work on the canopy skirt
Details

 06-25-2021
1.00
Rivet on nutplates for the empennage fairing
Details

 06-23-2021
1.50
Drill rivets for nut plates and mount Click-Bond n
Details
     

 06-12-2021
6.00
Mounting smoke system tank
Details
     

 06-11-2021
4.00
Finished up the left Landing/taxi light lense
Details
       

 06-09-2021
1.50
Cut, sand, and fit the left landing / taxi light l
Details
     

 06-08-2021
1.00
Cutting and fitting the lenses for the wing tips
Details
     

 06-07-2021
2.00
Alignment of wing tip edges to aileron edges
Details

 06-05-2021
4.00
Fitting and mounting the landing, taxi Aero LED VX
Details
       

 06-04-2021
4.00
Drill and cut out paterns for Aero LED VX landing
Details
     

 06-03-2021
2.00
Mounting the wing tips to the wings
Details
     

 06-02-2021
3.00
Wing tip modification for hing mount
Details

 05-31-2021
12.50
Left wing tip hing mounting
Details
       

 05-29-2021
7.00
work on wing tip modification to mount with hinges
Details
     

 05-27-2021
3.00
Work on the wing tip modifications to mount with h
Details
       

 05-21-2021
2.50
Work on wing tip modifiation to mount with hinges
Details
     

 05-18-2021
3.50
Cut, fit and drill right fibergalss wing tip
Details
       

 05-15-2021
6.00
Cutting, fitting, priming, and repeat
Details
       

 05-14-2021
2.00
Sanding, fitting, and priming
Details

 05-12-2021
1.50
Fiberglass the end pieces of right Ailerons
Details

 05-11-2021
1.50
Fiberglass in the outer edges of the flaps
Details
       

 05-10-2021
2.00
Cut foam and fiberglass in Left wing aleron ends
Details
     

 05-05-2021
2.00
Fiberglass on control surfaces and connecting fair
Details
     

 05-01-2021
6.00
Empennage Fairing and control surface end points
Details
       

 04-30-2021
1.50
Sanded and primed the empenage Fairing
Details

 04-29-2021
2.50
Taped and primed the inside of the canopy skirt
Details

 04-28-2021
2.00
Sanding and priming for fit and finish on control
Details

 04-26-2021
1.50
Canopy lock
Details
       

 04-24-2021
4.00
Flyboy canopy slide stops
Details
       

 04-22-2021
1.00
locking mechinisim mounted the stop block
Details

 04-19-2021
3.00
locking mechinisim
Details

 04-17-2021
5.50
Canopy latch and slide assembly
Details
       

 04-16-2021
3.00
Canopy latch and handle
Details
     

 04-15-2021
2.00
Canopy latch assembly
Details

 04-14-2021
2.00
Sanding, taping, and primer the canopy skirt
       

 04-13-2021
1.50
Sanding and fitting canopy skirt to fuselage
Details

 04-12-2021
1.50
Sanding and fitting canopy skirt
Details

 04-11-2021
2.50
Sanding and fitting on the canopy skirt.
Details
       

 04-10-2021
2.50
Sand and fitting of the canopy skirt
Details
       

 04-09-2021
1.50
Sanding and fitting for canopy skirt
Details

 04-07-2021
1.50
Sanding and fitting for canopy skirt
Details
       

 04-06-2021
2.00
Sanding and Lay up more fiberglass on the inside o
Details

 04-05-2021
1.50
Sanding and Lay up more fiberglass on the inside o
Details

 04-04-2021
1.00
Sanding rear skirt fitting

 04-03-2021
6.00
More work on the canopy skirt fit to the fuselage
Details
       

 04-03-2021
2.00
Drill for mounting fans to dash/windscreen
Details
     

 03-18-2021
1.50
Fiberglass work to modify the fit on the canopy sk
Details
       

 03-14-2021
1.50

Details
       

 03-13-2021
4.00
Fiberglass, filling, sanding, finish
Details
       

 03-13-2021
2.50
Drill and rivet canopy skirt
Details
       

 02-28-2021
1.50
Remove clamps and finish fillet bond on exterior
Details
     

 02-27-2021
7.50
Bond the canopy skirt to the plexiglass canopy and
Details
       

 02-26-2021
1.50
Preparing canopty skirt for bonding to canopy
Details
     

 02-24-2021
2.50
Fiberglass fit and finish on canopy skirt
Details

 02-15-2021
1.50
fiberglass work on canopy skirt
Details
     

 02-13-2021
2.00
Sanding and preping skirt and canopy to bond them
Details
     

 02-11-2021
1.50
Sanding finish on center rail notch
Details
     

 02-10-2021
1.50
Cutting, fitting, and glassing in the skirt notch
Details
       

 02-09-2021
2.00
Sanding, filling, and fitting on canopy skirt
Details

 02-07-2021
2.00
More filling, sanding and fitting
Details

 02-06-2021
9.00
Drilling, fitting, and clecoing the skirt
Details
       

 02-05-2021
2.50
Fitting the canopy
Details

 02-04-2021
3.00
Cuttting and fitting on the canopy skirt
Details
       

 02-03-2021
1.00
More cuttting and fitting on the canopy skirt
Details

 02-01-2021
2.00
Cutting and fitting the canopy skirt
Details
     

 01-31-2021
3.50
Pulled the right elevator, cut and fit foam and fi
Details
     

 01-30-2021
2.50
Filler on control surfaces
Details
     

 01-30-2021
6.50
Cutting and fitting canoy skirt
Details
       

 01-29-2021
2.50
Fill left rudder control edge
Details

 01-28-2021
2.00
Cut foam for ends of left elevator
Details
     

 01-26-2021
1.00
cut foam piece for top if vertical stabilizer
Details
     

 01-24-2021
3.00
Bonding the plexiglass to welded frame rail system
Details
       

 01-23-2021
0.50
Photos of plexiglass installation/bonding
       

 01-23-2021
2.50
Fiberglass tips on horizontal Stabalizer
Details
       

 01-23-2021
4.00
Bonding the plexiglass to the welded frame system
Details
       

 01-22-2021
2.00
Prep plexiglass and canopy rail
Details

 01-19-2021
2.25
The BIG cut
Details
       

 01-18-2021
1.50
Cutting, fitting, and masking
Details

 01-16-2021
6.00
Cut, sand, and fit repeat
Details
       

 01-13-2021
1.25
Cutting, sanding, fitting plexiglass canopy
Details

 01-12-2021
2.00
Cutting, sanding, fitting plexiglass canopy
Details

 01-09-2021
5.50
Cutting, Sanding, and fitting
Details

 01-02-2021
5.00
Cutting, sanding, and fitting
Details

 12-29-2020
1.50
Bolt engine mount to fuselage frame
Details
       

 12-27-2020
8.50
Designing the avionics rack system
Details
       

 12-27-2020
1.00
After a day of cutting/trimming and fitting review
Details
       

 12-26-2020
5.50
Trim and fitting canopy to frame/fuselage
Details
       

 12-19-2020
3.50
Triming off large flat platic pieces of the canopy
Details
       

 12-16-2020
1.50
Reassembled the forward top skin
Details
       

 12-12-2020
1.50
Wrap finish the left side canopy rail
Details

 12-10-2020
1.00
Finish wrap and attach left side rail
Details
       

 12-09-2020
2.00
Wrap left side rail and reinstall forward roll bar
Details
       

 12-08-2020
1.50
Wrapped Right side rail
Details

 12-05-2020
9.00
Assembly of canopy frame, rails, and slide block
Details
       

 11-30-2020
1.00
Riveting and alignment of center rail.
Details
       

 11-28-2020
8.25
Canopy assembly
Details
       

 11-27-2020
4.50
completed the wing connection tabs for left and ri
Details
       

 11-26-2020
6.00
Form flap fairing, debur, dimple, and rivet
Details
       

 11-17-2020
1.50
Left wing root fairing attachement
Details

 11-16-2020
1.75
Drill, debur, dimple, and rivet on the nut plates
Details
       

 09-07-2020
6.00
Nutplates for wing root fairing
Details

 08-01-2020
8.50
finish the wing attachments/fairings and remove th
Details

 07-17-2020
1.00
Trailing edge flap fairing
Details

 07-14-2020
1.50
Flap fairing and aileron edge alignment
Details

 07-13-2020
2.00
Adjusting flaps push rods and ailerons rods for be
Details

 07-11-2020
6.50
MFG, match drill, and trim wing root fairings
Details
       

 07-09-2020
1.00
Fuel line from fuel pump to firewall
Details
     

 07-08-2020
1.50
Fabricate the fuel and vent lines
Details
       

 07-07-2020
1.00
Fabricating fuel lines
Details

 07-06-2020
1.50
Left tank to fuselage lines
Details

 07-04-2020
8.50
Rebuilt the left tank bracket and install fuel pum
Details
       

 07-03-2020
3.00
Flap assembly and wing tank bracket
Details
     

 07-02-2020
3.00
mounting flap assembly
Details
       

 07-01-2020
1.75
Left flap assembly
Details
       

 06-30-2020
2.00
Left flap assembly
Details
     

 06-29-2020
1.00
Flap push rod assembly
Details

 06-28-2020
10.00
Exterior paint plan
Details
       

 06-27-2020
5.00
Attache Aleron push rod assembly and adjust flight
Details
       

 06-23-2020
1.50
mounting the 863 bracket to the fuselage
Details

 06-20-2020
3.00
Fab 860 tank bracket
Details

 06-19-2020
3.00
Bottom skin and tank attachment
Details

 06-18-2020
9.00
inserted the right wing and all measurements neces
Details
       

 06-17-2020
5.00
Removed interior features and insert the left wing
Details
       

 06-16-2020
9.50
Ran brake lines and wrapped the rib sections on ba
Details
       

 06-15-2020
5.50
Modify rib between bagage compartment and instrume
Details
       

 06-10-2020
2.00
sheet metal prep for forward skin
Details
       

 04-29-2020
2.00
Alignment and riveting Baggage door
Details
       

 02-26-2020
2.00
hardware assemble for forward baggage door
Details
       

 11-26-2019
3.00
Travel and unloading at Hangar
     

 11-26-2019
4.00
Project relocation from Las Vegas home to Hangar
Details
       

 06-01-2019
4.50
Baggage door assembly
Details
       

 05-31-2019
2.00
Forward Baggage door
Details
       

 05-30-2019
1.50
Match drilling and top skin assembly
Details
       

 05-29-2019
2.50
Top skin assembly
Details
       

 05-28-2019
2.50
Assembly of the instrument panel with notched flan
Details
       

 05-27-2019
1.50
Working on the forward top skin
Details
       

 05-27-2019
7.50
Prep and seal vent openings. Drill and seal stati
Details
       

 05-25-2019
4.00
Remove bulkheads and top skin and finish dimpling
Details
     

 05-24-2019
2.00
Clecoing on the top tail skin
Details
     

 05-23-2019
1.50
Fabricate wood platforms for working on the tail s
Details

 05-22-2019
1.50
nutplates on gussetts.
Details

 05-18-2019
3.50
Started to work on the turtle back assembly
Details

 05-18-2019
3.00
Ski rack for tail section
Details

 05-16-2019
3.50
Plumbing for fuel system
Details
       

 05-09-2019
2.50
Work on fuel, vent lines, and valve.
Details

 05-08-2019
1.00
working on vent lines
Details

 05-04-2019
10.00
Assembled the rudder pedan assebmly
Details
       

 04-27-2019
4.50
Rudder pedal assembly
Details
       

 04-26-2019
7.00
Modification made to rudder pedals. Extension of
Details
       

 04-25-2019
3.50
Forward rudder pedal assembly
Details
       

 04-23-2019
1.50
Rear rudder pedal assembly
Details
     

 04-22-2019
2.00
Rear Rudder pedal assembly
Details

 04-20-2019
3.50
Rear Rudder pedal assembly
Details

 04-18-2019
2.00
Rear rudder pedal assembly
Details

 04-17-2019
2.50
Front rudder pedal assembly
Details

 04-16-2019
1.25
bolt the rudder pedal cable guides to the cross me
Details
     

 04-15-2019
2.00
Mount flap motor to control arm and rivet the rudd
Details

 04-14-2019
2.00
Drilled out the holes and mounted the switches for
Details
       

 04-13-2019
2.00
Set up buttons on control stick
Details

 04-11-2019
3.00
Built the mold from the carved out foam.
Details
       

 04-10-2019
2.00
Trim rudder stops to correct rudder travel
Details
       

 04-05-2019
1.50
Connect the mid and aft pushrods for the elevators
Details
       

 03-24-2019
6.00
Design and fabricate a custom control grip
Details

 03-23-2019
2.00
Drill and mount the elevator horns
Details
     

 03-23-2019
4.00
Cut and connect control stick
Details
     

 03-20-2019
2.25
mounting control sticks and assembly
Details

 03-19-2019
2.50
Repair to the elevator horn
Details
       

 03-18-2019
2.00
Remove elevators from assembly for repair Assembl
Details
       

 03-16-2019
11.00
Assembly of push rods
Details
       

 03-09-2019
9.00
Rebuilding of left elevator Rivet and final assem
Details
       

 03-09-2019
2.50
Bell housing assembly and fabricate the push-rod
Details
       

 03-02-2019
11.50
Rebuilding the left elevator that fell
Details
       

 02-25-2019
2.00
Reconstruction of left elevator constuction
Details
     

 02-24-2019
1.00
Cut part of the counter weight from the right elev
Details

 02-23-2019
9.50
Rebuilding left elevator
Details
       

 02-14-2019
1.00
Pull together shopping list confirm and order part
Details

 02-13-2019
1.50
Bolting on concontrol surfaces
Details
       

 02-11-2019
2.50
After removing and deburring the horizontan and ve
Details

 02-09-2019
0.00
Squaring the vertical stabilizer
       

 02-09-2019
8.00
Mounting/attaching vertical stab.
Details
       

 02-06-2019
1.50
Removed red copy and band, installed blue copy and
Details
       

 02-04-2019
1.00
Temporary mount the vertical stabilizer
Details
       

 01-31-2019
6.50
Design work for Interior upholstry
Details
       

 01-26-2019
4.25
Mounting horizontal stabilizer
Details
       

 01-25-2019
4.00
Final fabrication of ski rack brackets
Details
     

 01-24-2019
2.50
Vinyl wrap the rear yoke bracket, left throttle as
Details
       

 01-22-2019
1.25
Match drill and rivet nuteplates on throttle assem
Details

 01-21-2019
3.25
Design, fabricate the mounting bracket for the MU1
Details
       

 01-19-2019
6.00
interior console and throttle assembly
Details
       

 01-18-2019
3.50
Layout the various antenna locations
Details
       

 01-17-2019
1.00
Wrap upper rear baggage compartment skin
Details

 01-17-2019
3.00
design and cut out pieces for a rear tail ski rack
Details
       

 01-16-2019
3.00
Wrap pieces of the seat ramp assembly and rear bag
Details
       

 01-15-2019
1.75
Match drill, debur, dimple, and rivet seat ramp ri
Details

 01-11-2019
2.25
Match drilling, deburing, and riveting nutplates
Details

 01-10-2019
1.75
Debur match dril cover plates for lower midcross m
Details

 01-09-2019
2.50
Rivet stiffiners and wrap both rear floor skins
Details
       

 01-07-2019
2.25
Remove and replace some hardward, rivet nutplates
Details

 01-05-2019
4.00
Rivet and wrap forward floor skin
Details
     

 01-02-2019
1.50
Riveting nutplates and stiffiners
Details
     

 01-01-2019
9.00
Deburing, match drilling, dimpling, and more debur
Details
       

 12-31-2018
2.50
match drill and deburring
Details

 12-29-2018
2.00
Drill small angles for platenuts and front seat hi
Details

 12-28-2018
4.00
Inventory parts bags
Details

 12-27-2018
4.00
Recieve Finishing Kit unpacking and inventory part
Details
       

 12-25-2018
5.00
Match drilling floor assembly
Details
       

 12-24-2018
2.00
Deburring and clecoing the floor assembly
Details
     

 12-22-2018
6.00
Continued work on interiors
Details
       

 12-20-2018
2.00
Riveted cooling ramp
       

 12-18-2018
2.00
seal up cooling ramp
Details
     

 12-15-2018
10.50
Rear seat back and interior finish
Details
       

 12-14-2018
1.50
Bolt the right side skins to Gear Leg weldament
Details

 12-01-2018
3.00
Vinyl wrapped the front seat assembly
Details
       

 12-01-2018
1.50
install the screws/bolts on the left side
Details

 12-01-2018
4.00
Front seat assembly
Details
     

 11-30-2018
1.50
Removing gear legs
Details

 11-24-2018
4.50
Riveting the side skins to lower longerons/gear bo
Details

 11-24-2018
1.50
front seat assembly
Details

 11-21-2018
2.00
More riveting for the bottom skins attachement to
Details

 11-19-2018
2.50
Rivet bottom forward skins to gear leg rib and sid
Details

 11-17-2018
1.50
Rivet the two forward bottom skins to floor assemb
Details

 11-16-2018
2.50
Tank seal applied to foreward skins
Details
       

 11-15-2018
1.50
Riveting bottom skins to fuselage
Details

 11-12-2018
8.00
Match drill, Debur, and dimple bottom forward skin
Details
     

 11-10-2018
2.50
Assembly of bottom skins
Details

 11-08-2018
3.00
Drilling and bolting the left gear leg
Details
       

 11-07-2018
3.25
Drilling, deburing, and bolting right gear leg
Details
       

 11-06-2018
2.00
Measuring again and again, still not cutting/drill
Details
       

 11-05-2018
2.25
Measure and move. Finally drilling outer wear pla
Details
     

 11-02-2018
2.00
Attaching main gear legs
Details
       

 10-30-2018
1.50
Drill main 7/16" holes in bracket and friction pla
Details

 10-26-2018
2.50
Rivet and bolt the seatback plate to the siderails
Details
     

 10-25-2018
1.75
Rivet seat back plate
Details

 10-24-2018
2.00
Rivet siderails to the fuselage assembly
Details
       

 10-23-2018
1.50
Rivet armrest and bulkhead assembly
Details

 10-22-2018
1.50
Final dril and bolt rear seat belt mounts
Details

 10-20-2018
1.50
Wrap vinyl on front bagage area
Details

 10-17-2018
1.50

Details

 10-06-2018
6.00
More vinyl wrapping for interior finish
Details
       

 10-02-2018
1.75
Laying vinyl for interior
Details
     

 09-30-2018
3.50
laying vinyl for some of the finish
Details
     

 09-29-2018
7.00
Finished up riveting the middle bottom skins and r
Details
       

 09-24-2018
3.50
set and rivet bottom middle skin
Details
       

 09-22-2018
10.00
Finished riveting both left and right side skins.
Details
       

 09-20-2018
1.75
Vinyl wrap some pieces
Details

 09-20-2018
1.50
Rivet pieces of the right rear skin
Details

 09-19-2018
1.50
Riveting left rear side skin to lower longeron
Details

 09-18-2018
2.00
Riveting rear side skins
Details

 09-17-2018
1.50
Wrapped the right gear box to match efforts on the
     

 09-16-2018
2.00
Vinyl wrap for left gear column
Details
       

 09-15-2018
7.00
finished up the riveting on the mid skins
Details
       

 09-13-2018
2.00
Spend an hour riveting mid skins
Details
       

 09-07-2018
1.50
riveting mid sikin
Details

 09-05-2018
1.50
Rivet left mid skin
Details

 09-04-2018
1.50
Riveting the left mid skin
Details
     

 09-03-2018
10.50
Built the access rotisserie
Details
       

 08-25-2018
5.00
Rivet the forward skins
Details
       

 08-24-2018
2.00
Rivet forward skins
Details
       

 08-23-2018
2.25
Cleco parts together
Details
       

 08-22-2018
3.75
Rear bulkhead assembly
Details
       

 08-21-2018
3.50
Side Skin riveting and assembly
Details
       

 08-20-2018
3.25
Rivet rear bagage ribs and bulkhead
Details
       

 08-15-2018
1.25
Tank sealer to forward side skins
Details
       

 08-11-2018
7.50
Assembly and rivet sections and route fuel and ven
Details
       

 08-11-2018
2.50
Access panels in gear box
Details
       

 08-09-2018
2.50
Access panels in gear box
Details
       

 08-08-2018
2.00
Back riveting mid side skins and start reassembly
Details
       

 08-07-2018
2.00
Rivet the Mid structure arm rest and bulkheads tog
Details

 08-06-2018
2.50
Attachement of the forward and mid floor
Details
       

 08-04-2018
6.00
Begin the reassembly of the fuselage parts
Details
       

 08-03-2018
3.50
Deburing, dimpling, and priming
Details

 08-02-2018
2.75
Deburing and dimpling
Details

 08-01-2018
1.00
Deburing and dimpling bulkhead and pieces in fusel

 07-30-2018
2.00
Deburing and dimpling fuselage pieces
Details
     

 07-21-2018
5.50
More deburing, dimpling
Details
       

 07-18-2018
1.50
Debur and dimple the Left forward skin
Details
     

 07-17-2018
2.50
Deburing and dimple mid skins
Details

 07-16-2018
1.50
Debur, dimple, left side tail skin
Details

 07-14-2018
8.50
Deburing, painting, and dimpling
Details
       

 07-13-2018
2.00
Countersinking
Details

 07-10-2018
2.00
Countersink dimple and deburing
Details

 07-07-2018
9.00
Match drilling, disassembly, and deburing
Details
       

 07-05-2018
1.00
Cut shape out of tail skin for tailwheel assembly
Details
     

 07-04-2018
6.00
Braces for rear seat roll bar and tail wheel
Details
       

 06-27-2018
2.00
Drilling and clecoing
Details
       

 06-26-2018
3.25
Match drilling and clecoing
Details
       

 06-23-2018
5.50
Match drill mid skins and bottom skins. Drill upp
Details
       

 06-21-2018
2.50
Match drill front skins, Drill holes for top longe
Details

 06-20-2018
2.00
Drilling the forward uper Longerons and forward sk
Details
       

 06-18-2018
2.00
Align and match drill the lower and mid longerons

 06-16-2018
6.25
Upper longerons, Rails, and box covers
Details
       

 06-15-2018
2.50
Bottom skin
Details
       

 05-31-2018
1.00
Cleco tail assembly together with bulkheads and si
Details
       

 05-28-2018
5.00
Deburing skins and lower/mid longeron
Details
       

 05-26-2018
8.50
construction of the rear bulkheads for the tail as
Details
       

 05-24-2018
2.50
Rear bulkhead assembly
Details
       

 05-23-2018
1.50
Tail bulkhead assembly
Details

 05-22-2018
2.50
Tail bulkhead assembly
Details
       

 05-21-2018
3.00
Cleco structure and skin
Details

 05-19-2018
1.50
Disassemble and re-clecoe the left and right mid s
Details

 05-16-2018
2.00
Match drill and cleco left forward skin
Details
     

 05-12-2018
1.50
Clecoe arm rest structure
Details
       

 05-09-2018
2.00
Cut vent lines and clecoed the floor assembly toge
Details
       

 05-08-2018
2.00
forming the mid skins
Details
       

 05-07-2018
1.75
Deburing parts, countersinking nutplates, and rive
Details
       

 05-05-2018
4.50
Deburing arm rest
Details
     

 05-03-2018
1.50
Longeron and gussett fitting
Details

 05-02-2018
1.50
Lower right longeron assembly
Details

 04-30-2018
2.00
Lower left longeron
Details

 04-28-2018
3.50
Fitting lower left longeron
Details

 04-26-2018
2.00
Gussets for mid and lower longerons
Details
       

 04-25-2018
2.00
Bending gear box and bulkhead gusset / web enclosu
Details
       

 04-23-2018
3.00
Forming up the left and right upper longerons
Details

 04-21-2018
6.50
Seat/floor assembly and longerons
Details
       

 04-19-2018
2.00
Rivet inbound forward and aft ribs
Details
       

 04-18-2018
1.50
Rivet seat bulkhead
Details

 04-14-2018
4.00
Deburing and assembly of floor ribs
Details

 04-12-2018
1.50
deburing
Details

 04-11-2018
2.50
Uncleco parts parts and start deburing holes and e
Details

 04-10-2018
2.00
clecoed the floor assembly and match drilled botto
Details
       

 04-07-2018
7.00
Floor assembly and Aileron trim brackets
Details
       

 04-06-2018
1.00
Fabricate 805 support tabs
     

 03-31-2018
9.50
Finish up the bulkhead assembly and start the rear
Details
       

 03-29-2018
2.50
Bulkhead assembly
Details
       

 03-26-2018
2.50
Riveting bulkhead assembly
Details
       

 03-24-2018
9.00
Began the center substructure / bulkhead assembly
Details
       

 03-23-2018
2.00
finishing up the baggage assembly
Details
       

 03-21-2018
2.00
Forward bagage assembly
Details

 03-19-2018
2.00
Debur and flute bagage area assembly
Details
       

 03-17-2018
7.50
Riveted the box assemblies to the floor assembly
Details
       

 03-17-2018
4.00
Finishing up the gear box assemblies
Details
     

 03-15-2018
2.00
Rivet the left gear box assembly
Details
       

 03-14-2018
3.50
Riveting and deburing
Details
       

 03-12-2018
1.50
Countersinking and deburing right box assembly
Details

 03-10-2018
4.00
Countersinking, deburing, and riveting of floor as
Details
       

 03-10-2018
5.25
Box gear assembly, clecoing, match drill and debur
Details
       

 03-08-2018
2.50
Dimple / Deburing floor assembly
Details
     

 03-05-2018
6.50
Forward floor assembly
Details
       

 02-28-2018
2.00
Riveting structure to firewall
Details

 02-26-2018
3.00
Dimple and start riveting structure to firewall
Details
       

 02-24-2018
8.50
Began Firewall assembly
Details
       

 02-22-2018
1.50
Rivet right wing flap hinge into place
Details
       

 02-21-2018
1.50
Epoxy in and rivet Pitot tube mast
Details
     

 02-19-2018
7.50
Rivet the outbound bottom skin on right wing
Details
       

 02-01-2018
2.00
mistake and drilling out rivets to remove the wrin
Details

 01-29-2018
2.00
Riveting the bottom skin
Details
       

 01-27-2018
5.00
Rivetted the bottom inbound skin to the right wing
Details
     

 01-24-2018
1.50
drill holes for set screws
Details
     

 01-22-2018
2.00
marked and cut wing skin for pitot tube mast
Details

 01-14-2018
7.00
EAA Sportsmans Workshop Composit construction clas
Details
       

 01-13-2018
8.00
EAA Sportsman Workshop Composite Construction Clas
Details
       

 01-10-2018
2.00
Inventory
Details

 01-09-2018
4.00
Unpacking and inventory
Details

 01-08-2018
3.50
Unpacking crate and inventory parts
Details
       

 01-03-2018
1.00
Mounted the Garmin 28 servo bracket as part of th
Details
       

 01-03-2018
1.50
Aileron assembly for the right wing
Details
       

 01-01-2018
3.00
Finished riveting the bottom skin for the left win
Details
       

 12-28-2017
1.75
Riveting bottom skin for left wing
Details

 12-25-2017
7.50
Riveting the bottom skin
Details
       

 12-23-2017
1.50
Removed the push rods andcut out some of the ar
Details
       

 12-23-2017
1.00
Mount the Flap hinge for left wing
Details

 12-21-2017
1.75
Aieron linkage
Details

 12-20-2017
2.00
Assembly of the bell crank and push rods for the l
Details
       

 12-19-2017
2.00
Assembly of pushrods
Details
 

 12-16-2017
7.50
Final assembly of the right flap
Details
       

 12-14-2017
1.50
Riveted the 706 plat to spar and doubler to the ri
Details

 12-13-2017
1.50
Debur and dimple flap skin, ribs, and spar

 12-09-2017
1.50
Riveted the top forward skin to spar connection on
Details

 12-02-2017
9.00
Assembly and riveting
Details
       

 11-30-2017
2.00
Dimple skins, ribs and top spar. Counter sink bott
Details

 11-29-2017
1.75
Debur skins, spar, and ribs
Details

 11-28-2017
2.50
Deburing
Details

 11-27-2017
1.50
Flap assembly, match drill and fabrication of 706
Details
       

 11-26-2017
1.00
Clecoing on the top skin for both flaps
Details
     

 11-25-2017
4.00
Began the assembly of the flaps
Details
       

 11-25-2017
3.00
Assembly of the aileron
Details
     

 11-20-2017
2.00
Left aileron assembly
Details

 11-18-2017
6.50
Completion of the right aileron
Details
       

 11-16-2017
2.00
Right Aileron assembly
Details

 11-15-2017
1.50
Assembly of aileron skins to spar
Details

 11-14-2017
1.50
Aileron assembly
Details
     

 11-13-2017
1.50
assembly of Right Aileron
Details

 11-04-2017
2.00
Cleco the left aileron assembly
Details
       

 11-02-2017
1.00
Reinforement plate for spar/hardware

 10-29-2017
2.00
reinforcing plates for ailerons
Details

 10-28-2017
6.50
Riveting the stiffeners to the aileron skin
Details
       

 10-25-2017
1.50
Match drill stiffenfers to aileron skins

 10-24-2017
2.00
grind and debur aileron stiffeners
Details
       

 10-23-2017
1.50
Cut out aileron stiffners

 10-03-2017
1.50
Bottom wing skin access panel
Details

 09-21-2017
2.50
Access panels for right wing
Details
     

 09-16-2017
4.50
Aleron and flap fairings
Details
     

 09-09-2017
5.00
Aleron and flap fairings on right wing
Details
       

 07-12-2017
1.50
Aleron and flap fairings
Details
       

 07-11-2017
1.50
Torque fuel tank bolts and cleco on flap/aleron br
Details

 07-03-2017
3.50
build wing cradle and move wings from the stands t
Details
       

 06-29-2017
2.00
Riveting together Aileron and Flap brackets
Details

 06-27-2017
2.00
Flap and aileron brackets
Details
       

 06-26-2017
3.00
Finished riveting the left wing top skin
Details

 06-17-2017
7.00
Riveted a good portion of the left wing
Details
     

 06-14-2017
3.00
Team riveting
Details
       

 06-08-2017
2.50
Riveting top skin for right wing
Details

 06-06-2017
3.00
Riveting top skin to right wing
Details

 06-05-2017
2.00
Riveting top wing skin to ribs
Details
       

 05-30-2017
2.00
back rivet main wing skins together
Details

 05-10-2017
2.25
Leading edge assembly and tanks
Details
       

 05-09-2017
2.25
Rivet right leading edge to main spar
Details

 05-06-2017
6.00
Riveting leading edge and attaching to main spar
Details

 05-05-2017
2.00
Rivet leading edge, route stall warning wiring
Details
       

 05-04-2017
1.50
Riveting the left leading edge and Stall warning d
Details

 05-03-2017
1.50
Flared the pitot lines for fittings, Started rivet
Details
       

 05-02-2017
2.50
Conduit line, pilot line assembly
Details
       

 05-01-2017
2.00
Debur, dimple, and cleco top skin for right wing
Details

 04-26-2017
2.00
Right leading edge prepartion
Details

 04-25-2017
2.00
Deburing, dimpling of right leading edge skin

 04-24-2017
2.00
Right leading edge
Details
     

 04-23-2017
0.75
clecoed the painted ribs on the left leading edge

 04-22-2017
5.00
work on the leading edge of the left wing
Details

 04-17-2017
5.00
Re-tested Left tank and sealed up Right tanks
Details

 04-14-2017
1.50
Repair leak in Left tank from failed tank test
Details
       

 04-11-2017
2.00
Seal access panels for both fuel tanks
     

 04-08-2017
8.50
Preparation of Left baffle. Seal fuel sending dev
Details
       

 04-02-2017
1.50
Right Baffle preparation Debur, and D/A finish for
Details
       

 03-20-2017
2.00
Seal and rivet in outbound rib for right tank
       

 03-18-2017
2.00
Rivet in the outbound rib on the left tank

 03-17-2017
2.00
Seal flop tubes and breather lilne
Details
       

 03-16-2017
2.50
Seal and rivet inbound ribs into both tanks. Seal

 03-15-2017
2.00
Seal and rivet in 2nd rib on left tank
Details

 03-14-2017
2.00
Seal and rivet doubler rings for fuel sending unit
Details
 

 03-13-2017
1.50
Fuel sending units, doubler plates
Details
     

 03-04-2017
1.50
Modification for anti-obstruction bracket
Details
       

 03-03-2017
2.00
Tank assembly
Details

 03-02-2017
2.50
Seal and rivet in two more ribs on left tank

 02-27-2017
2.50
sealed and riveted two ribs into left tank
       

 02-25-2017
8.50
Riveted in the interior ribs for the left tank, in
Details
       

 02-24-2017
2.00
D/A (scuff up) rib edges for sealant. Safety wir
Details
     

 02-20-2017
6.50
Preparation D/A surfaces and MEK wash for final cl
Details
       

 02-20-2017
0.00
Photos of sealant
Details
       

 02-20-2017
0.00
Photos of sealant
       

 02-18-2017
8.00
Fuel tank assembly. Fuel caps, drains, and vent l
Details
       

 02-17-2017
1.50
Rivet nutplate to access panel
Details
       

 02-16-2017
1.50
Access panel and doubler ring deburing / dimpling
Details

 02-15-2017
1.50
Drill the oposite rib access panel and match drill
Details
     

 02-14-2017
0.50
Drilled the access hole in the rib with a Fly-cutt
Details
     

 02-13-2017
2.00
Dimpling ribs and wing skins
Details

 02-11-2017
4.00
deburing and hinged door for invertied fuel system
Details
       

 02-10-2017
1.00
Building the fuel sending devise linkage
Details
     

 02-08-2017
1.00
Drill rivet placments for attachement angles and b

 02-06-2017
1.50
Fabricate the two attachement angles
Details
       

 02-01-2017
3.00
Counterskining and deburing fuel tanks/wing skins

 01-31-2017
1.00
Countersinking wing skins for fuel tank

 01-24-2017
2.00
Countersink tank skin
Details

 01-22-2017
7.00
EAA Electrical workshop
Details
     

 01-14-2017
8.00
EAA Electrical Workshop
Details
     

 01-11-2017
3.00
Counter sinking fuel tank skin and main spar point
Details

 12-28-2016
1.25
countersink bottom side of right fuel tank
     

 12-27-2016
1.50
Dimple ribs on Left top wing section. Countersink

 12-26-2016
4.50
Deburing and dimpling wing skins

 12-24-2016
7.00
Skin preparation and Right fuel tank assembly
Details
       

 12-20-2016
1.00
Match drill rib sections with left tank skin

 12-19-2016
1.00
Cleco tank ribs to tank skin
Details
     

 12-17-2016
6.00
Assembly of fuel tanks
Details
       

 12-16-2016
3.00
Debur and dimple wing skins
Details

 12-15-2016
1.00
Deburing wing skins

 12-10-2016
2.50
Baffle construction
Details

 12-05-2016
2.50
Brackets for gas tanks
Details

 12-03-2016
7.00
Bracket construction
Details
       

 11-19-2016
2.00
Bottom wing skin deburing
Details

 11-14-2016
2.00
Debur and dimple the bottom skin
Details
       

 11-13-2016
1.00
debured the left bottom wing skin

 11-12-2016
3.00
Cleco and match drill ribs to main spar assembly
Details

 11-11-2016
3.00
remove bottom wings skins and trim off vinyl prote
Details

 11-05-2016
2.00
Assembly of right wing leading edge
Details

 10-29-2016
4.50
Leading edge assembly for left wing
Details
       

 10-27-2016
2.00
Cleco on the bottom skin for both right and left w
Details

 10-26-2016
1.00
Match drill top skin for left wing

 10-24-2016
2.00
Electrical pumbing
Details

 10-22-2016
1.00
drill top skin matching holes
Details

 10-18-2016
1.00
Rivet Leading edge access door and nutplates
Details
       

 10-17-2016
1.50
Access door for leading edge, left wing
Details

 10-15-2016
8.00
Main spar, Rib and skins
Details
       

 10-12-2016
2.00
Drill holes for flex conduit
Details

 10-11-2016
2.00
Rivet ribs to rear spar assembly
Details

 09-19-2016
1.50
riveting left wing ribs to main spar
       

 09-17-2016
2.00
Rivet and re-rivet ribs to spar
Details
       

 09-10-2016
2.25
Rivet connections for right ribs to main spar

 09-09-2016
1.50
Rivet connections for right ribs to main spar

 08-20-2016
6.00
Main and rear spar assembly
Details
       

 08-18-2016
2.00
Rear spar assembly rework
Details

 08-10-2016
2.00
fluting leading edge ribs
Details
     

 08-09-2016
1.50
Clecoed ribs back to main spar
Details
     

 07-28-2016
3.00
Prep ribs for main spar assembly
Details

 07-27-2016
2.50
Prep on wing ribs
Details

 07-26-2016
3.50
DA/Scuff left wing spars and primer
Details

 07-23-2016
3.00
Debur edges on wing spars
Details

 07-16-2016
2.50
Flute wing spars
Details

 06-25-2016
5.00
work on the rear wing spars for assembly
Details

 06-23-2016
1.50
Bolt on the tie down assemblies
Details
       

 06-22-2016
2.00
Drill platenuts on tie down assembly
Details

 06-21-2016
1.50
Drill and cut spacers
Details

 06-11-2016
6.00
Rivet nut plates, prime counter sinking, and tie d
Details
       

 06-02-2016
1.00
Rivet nutplates to main spar
Details

 05-30-2016
3.00
Countersink main spars for nutplate
Details

 05-28-2016
3.50
Nutplates
Details
       

 05-26-2016
1.50
review plans, lable main spars, and adjust counter
Details

 05-25-2016
2.00
Mounted the right main wing spar to the wing stand
Details

 05-24-2016
1.50
Attach angle brackets and leveling all thread adju
Details

 05-23-2016
1.50
Drill and anchor the second wing stand
Details

 05-21-2016
2.00
Setting and bolting one of the wing stands
Details

 05-20-2016
2.00
Fitting rudder to stabilizer and fiberglass tip
Details
       

 05-17-2016
2.00
Install fiberglass tips on Horizontal Stabilizer
Details
       

 05-16-2016
2.00
Drill elevator horns for attachement to horizontal
Details

 05-15-2016
0.25
Connection of the elevator horns
Details
     

 05-14-2016
5.00
final fitting and assembly
Details
       

 05-12-2016
2.50
final assembly of elevator trim, attachment bearin
Details
       

 05-11-2016
2.00
roll and rivet leading edge of Left elevator
Details
     

 05-02-2016
2.50
Wing Stands
Details
       

 04-30-2016
8.00
Final assembly of Left Elevator
Details
       

 04-27-2016
2.00
Left Elevator, trim tab assembly
Details
     

 04-25-2016
2.00
Trim Tab assembly for left elevator
Details

 04-23-2016
1.50
Trim tab assembly
Details

 04-16-2016
8.00
Left elevator assembly
Details
       

 04-15-2016
2.00
Assembly of electronic trim system
Details
       

 04-14-2016
2.00
unpacking and inventorying

 04-12-2016
2.00
unpacking and inventory

 04-09-2016
3.00
unpackaging and inventorying parts

 04-07-2016
2.00
Received Wing kit
Details
       

 03-23-2016
2.00
Match drilling skin for left elevator
Details

 03-19-2016
1.00
Cleco elevator skin to left elevator
Details

 03-17-2016
1.50
Prep and drill countersink weight and ski
Details

 03-10-2016
1.50
Rivet the Left Elevator spar doublers and nut plat

 03-09-2016
1.50
form/bend the leading edge of the elevator assembl
Details
     

 03-02-2016
1.50
flush rivet elevator skin to assembly
       

 03-01-2016
2.00
cleco, match drill elevator skin to assembly
Details

 02-27-2016
5.50
Riveting Right Elevator assembly
Details
       

 02-26-2016
2.00
Right Elevator Assembly
Details

 02-24-2016
1.50
Bending/forming leading edge of Rudder
Details
       

 02-20-2016
4.50
Assembly of right Elevator components
Details
       

 02-19-2016
1.50
Right & Left Elevator Assembly match drilling and
Details

 02-17-2016
2.00
fitting fiberglass rudder end
Details
       

 02-15-2016
2.00
Rivet rudder skin to rib and spar
Details
       

 02-12-2016
1.00
RTV Silicone on stiffiners and cleco rudder skin t
Details

 02-06-2016
3.00
Dimpled skin and spar edges. Rivet on spar double
Details

 02-05-2016
2.50
Back rivet final stiffiners. clean and prep Rudd
Details

 02-02-2016
2.50
trim stiffiners, match drill, and debur skin and s
Details

 02-01-2016
1.00
Rivet left elevator stiffiners
Details

 01-30-2016
3.50
Prepare elevator skin and stiffiners
Details
       

 01-28-2016
2.50
Prep skin and stiffiners on right elevator
Details

 01-27-2016
2.00
Cut stiffiners for the right elevator, clean / pre
Details
     

 01-25-2016
1.00
Wood clamp and wood edge tool
Details
     

 01-20-2016
1.50
fabricate 717 shim and 716 stiffiners, and assembl
Details

 01-18-2016
1.50
Rivet rudder stiffiners to skin
Details
       

 01-18-2016
0.50
Hinged 2 x 8 bending tool
Details

 01-17-2016
6.00
Education 2nd day of Sheet Metal Class
Details
       

 01-16-2016
8.00
Education, Sheet Metal Class
Details

 01-14-2016
2.50
Deburing, dimpling, and riveting rudder assembly
Details
       

 01-11-2016
1.50
Cu, Clean,t and cleco stiffeners to skin
Details
     

 01-09-2016
0.50
Start the rudder assembly
Details

 01-07-2016
3.00
Finish Vertical Stabilizer
Details
       

 01-06-2016
2.00
Rivet rear spar and doubler
Details
       

 01-05-2016
1.00
Prep and Prime the non Alclad parts
Details

 01-04-2016
2.00
Deburring, edge finishing, and dimpling
Details
       

 01-02-2016
2.50
Rough assembly and match drill the vertical stabil
Details
       

 01-01-2016
2.75
Completion of the Horizontal Stabilizer
Details
       

 12-31-2015
2.50
Rivet the right side skin to the forward spar and
Details
       

 12-30-2015
2.00
Rivet skin on left side of horizontal stabilizer
Details
       

 12-26-2015
4.50
Final prep front and rear spar
Details
       

 12-25-2015
5.00
Front and Rear Spar Assembly
Details
       

 12-23-2015
1.50
Match drill right side of the horizontal stabilize
Details

 12-19-2015
1.00
Horizontal Stabilizer Left side
Details
       

 12-14-2015
1.00
Front spar assembly
Details

 12-12-2015
4.00
trim doublers, buff and prime rear Spar doublers.
Details
       

 12-08-2015
1.00
match drill and deburing

 12-07-2015
2.00
Rear spar assembly and deburing
     

 11-21-2015
1.00
organize and set up shop area
     

 11-16-2015
1.00
verity kit items and inventory
       










Copyright © 2001-2024 Matronics. All Rights Reserved.