KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  5-1-2021
Number of Hours:  6.00
Manual Reference:  fiberglass finish
Brief Description:  Empennage Fairing and control surface end points

Taped and Painted out the the rest of the canopy frame to black.

Wet sanded the control surface enp points for the rudder and elevators. Changed out the control quadrant bolt to allow the unit to be mounted properly. Finished up mounting the Flyboy canopy slide blocks that hold the canopy open a two points.
' style=

Throttle quadrant

Throttle quadrant

' style=

Underside of canopy skirt painted black

Underside of canopy skirt painted black

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.