I've begun adding more adel clamps in the nose forward of the panel for routing the avionics wires to the instruments. I also trial fitted the cabin light dimmer switch and needed to clear out a little glass and foam for it to fit. I also had to re-locate one of my adel clamps as it was too close for good clearance. Next I ran the ELT wire through the conduit, decided on a location to mount the ELT tray and instead of trying to mount hardpoints inside the baggage area, I whipped up some Flox and layed the tray down on top of a nice bed of the stuff. Avionics are set to be COMPLETE in 1 month so All this work must be done before I leave town for 2 weeks. Getting to the finish line!!