KitLog pro

Powered By Kitlog Pro v2.0

Stevens Web Site
Work Logs Found: 55
Category Work Time: 137 Hours
 Date
Hours
Work Log Summary

Details

 10-28-2005
0.30
Finished the Empenage!
Details

 10-27-2005
3.30
Rolled leading edges of elevators
Details
     

 10-26-2005
2.00
Final assembly of trim tab
Details
       

 10-25-2005
2.00
Trim tab priming
Details

 10-24-2005
2.80
Trim tab construction
Details

 10-20-2005
2.70
Riveted skin to left elevator
Details
     

 10-18-2005
2.00
Riveted Left Elevator Skeleton
Details
       

 10-17-2005
2.80
Tab bending hell.
Details
       

 10-13-2005
3.00
Primed left elevator parts
Details

 10-04-2005
2.30
Trim Tab Servo Mania
Details

 10-03-2005
3.00
Drilled left elevator skins
Details

 09-30-2005
2.90
Finished Left Elevator, started on the right
Details
       

 09-29-2005
2.80
Riveting the elevator
Details

 09-23-2005
1.70
Deburred, dimpled and primed right elevator.
Details

 09-19-2005
3.20
Clecoed and drilled Rt. elevator
Details
       

 09-14-2005
2.50
Prep Left elevator skeleton
Details
       

 09-12-2005
2.90
Riveted stiffeners onto elevator skins
Details
       

 09-10-2005
4.20
Prepared elevator stiffeners
Details
     

 09-04-2005
4.50
Riveted rudder skin to skeleton
Details
       

 09-03-2005
2.50
Finished rudder skeleton
Details
       

 09-01-2005
2.70
Dimpled and primed rudder
Details
     

 08-31-2005
1.20
Deburred rudder parts
Details

 08-30-2005
2.60
Rudder skeleton
Details
     

 08-23-2005
1.50
Finished elevator stiffeners.
Details
     

 08-22-2005
1.80
Cut out elevator stiffeners
Details

 08-21-2005
2.20
Finishing the rudder trailing edge and messing up
Details
       

 08-20-2005
3.00
Back riveted rudder stiffeners to skin.
Details
       

 08-19-2005
2.80
Debur, dimple and prime rudder skin & stiffeners
Details
       

 08-18-2005
3.00
Starting on the rudder
Details
       

 08-17-2005
1.80
Finished Vertical Stabilizer
Details
       

 08-16-2005
3.10
Finished Horizontal Stabilizer
Details
       

 08-14-2005
5.50
Riveting HS skin
Details
       

 08-08-2005
0.80
Prime and clecoed VS skin
Details
       

 08-07-2005
3.50
Prime and assemble the VS skeleton
Details
     

 08-01-2005
0.10
Back from Oshkosh
Details
       

 07-18-2005
1.80
Dimpled VS skin
Details

 07-17-2005
1.60
Drilled VS rear spar doubler lightening holes
Details

 07-16-2005
1.80
Deburred VS skeleton and rear spar doubler
Details

 07-15-2005
2.20
Finished VS skeleton, match drilled VS skin
Details

 07-14-2005
1.00
Assembled Vertical Stabilizer Spar and straightene
Details

 07-13-2005
1.60
Riveted HS nose rib
Details

 07-12-2005
2.80
Riveted HS skeleton, reprimed parts
Details

 07-11-2005
3.50
Primed left HS skin and inside of HS skins
Details

 07-10-2005
0.00
Rivet practice
Details
     

 07-06-2005
1.00
Primed right half of HS skeleton
Details

 06-22-2005
1.60
Finished dimpling HS skins, primed one rib
Details

 06-21-2005
1.80
Dimpled HS skins
Details

 06-17-2005
1.20
Build jig for C-Frame dimpler
Details
       

 06-15-2005
3.30
Deburred and dimpled HS skeleton
Details

 06-14-2005
3.50
HS drilling and blue plastic removal
Details
     

 06-13-2005
3.20
Finish HS skeleton and drill to skins
Details
     

 06-12-2005
0.60
HS rib straightening
Details

 06-11-2005
8.30
Horizontal Stabilizer front spar and skeleton
Details
       

 06-09-2005
4.30
Vertical Stabilizer rear spar
Details
       

 06-06-2005
3.10
Empenage kit arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.