Powered By Kitlog Pro v2.0
Pauls Web Site
Aircamper
All
Work Logs Found:
44
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
01-27-2020
8.00
Wing construction Jig
Details
11-10-2019
1.50
Made up aand secured side mount brackets
Details
10-28-2019
1.50
Landing gear attachment brackets
Details
10-26-2019
1.50
De Burring
Details
10-23-2019
2.00
De burring and cleaning
Details
10-20-2019
3.00
Painting metal parts
Details
10-09-2019
2.00
Removing parts for cleaning
Details
10-08-2019
2.00
Disassembly
Details
04-09-2016
3.50
Initial visit
Details
03-28-2016
2.50
Fixing Mstr Brake Cly mounts in place
Details
03-27-2016
2.50
Details
03-20-2016
3.00
Sanding LG 8 spacer to fitt wheel bearings
Details
03-14-2016
1.00
Sanding master cylinder mounts
Details
03-13-2016
2.20
Micro filling
Details
03-12-2016
2.00
Making the dual brake mounting plates 3
Details
02-29-2016
1.00
Making the dual brake mounting plates 2
Details
02-29-2016
1.00
Making the dual brake mounting plates 1
Details
02-28-2016
2.00
Project Admin
Details
02-27-2016
2.00
Making spacers and inserts
Details
02-23-2016
0.45
Brake Master Cylinder Mounts
Details
02-21-2016
1.30
Aileron rigging
Details
02-20-2016
7.00
making CS5 and CS12 pushrods
Details
02-17-2016
6.00
Dry fitting and setting rigging
Details
02-15-2016
0.20
Advice/confirmation on rigging
Details
02-13-2016
4.00
Barrel nuts
Details
01-26-2016
1.50
Stripping out original rigging
Details
12-31-2015
0.30
Trail fitting new ptito head to canard
Details
12-31-2015
0.30
Making header tank breather tube
12-31-2015
0.30
Making and dry fitting new Pitot head
Details
12-28-2015
1.00
Remaoval and clean up of Pitot Head
Details
12-27-2015
1.50
Fitting the La Rue brake mod to the LH pod
Details
12-26-2015
1.50
Fitting modified brake assembly (RH Pod)
Details
12-13-2015
4.00
Remove and install brake lines
Details
12-06-2015
2.00
Making and fitting fuselage jioning tabs
Details
12-06-2015
1.00
General clean up and making safe
Details
07-19-2015
3.00
Stripped and cleaned Master clyinders and Calpiers
Details
07-12-2015
5.00
Inspection of left side and canard prior to Hi bui
Details
06-06-2015
1.00
Sanding dry micro
Details
06-06-2015
1.00
Fitting of new instrument panel blank
Details
05-16-2015
1.00
Upper wing prep and micro filling
Details
03-09-2015
3.00
Sanding Canards and pods
Details
03-02-2015
2.00
Sanding Left Canard and left fwd fuse
Details
03-01-2015
2.50
Elevator foam sealing prep
Details
01-26-2015
9.00
Prepared and hi coat primed right side of aircraft
Details
SITE NAVIGATION
Contact Builder
GN-1 Aircamper Home
Quickie 2 Home
Aircamper Home
Category
# Logs
# Hours
All
49
117
Ailerons
5
20
Aircraft Project
1
3
Brakes
4
5
Brakes
5
9
Canard
3
10
Empennage
1
2
Fuel
1
0
Fuselage
3
4
Instruments
1
1
Miscellaneous
17
39
Pitot static system
4
5
Tools
1
8
Undercarriage
1
3
Wings
2
8
Copyright © 2001-2024 Matronics. All Rights Reserved.