KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  8-3-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Drilled the outboard T-410 pieces and installed ri

Drilled the outboard T-410 pieces and installed ribs in the left tank in preparation for the prosealing the ribs. Sanded all contact surfaces with 100 grit sandpaper and cleaned the surfaces with MEK. The ribs were 100% clecoed in prep fpr prosealing.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.