Brief Description: Drilled the outboard T-410 pieces and installed ri
Drilled the outboard T-410 pieces and installed ribs in the left tank in preparation for the prosealing the ribs. Sanded all contact surfaces with 100 grit sandpaper and cleaned the surfaces with MEK. The ribs were 100% clecoed in prep fpr prosealing.