KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  12-10-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilled a Tail Light Hole Through the Aft Bulkhead

Drilled a Tail Light Hole Through the Aft Bulkhead and Vertical Stabilizer Spar. Ran conduit over the tail light bundle and tested the fit through the hole. I'm happy with the results.

I finally got around to riveting the elevator stops in place.
' style=

Test Fit Wires and Conduit

Test Fit Wires and Conduit

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.