KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  11-12-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed the Dual Magnetometers

Installed the Dual Magnetometers after installing four aluminum rivnuts. To do this, the holes in the aft deck were drilled with a #2 bit and each rivnut was pulled using a rivnut tool. Used #8 x 2" brass screws to secure the boxes. I installed industrial strength velcro between each magnetometer to them from moving relative to each other as the were secures to the aft deck.
' style=

Rivnut tool

Rivnut tool

' style=

Magnetometers on Aft Deck

Magnetometers on Aft Deck

' style=

Aft View of Installation

Aft View of Installation

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.