Date
|
Hours
|
Work Log Summary

|
Details

|
05-20-2010
|
2.00
|
Starting the engine
|
Details
|
|
|
12-30-2009
|
2.50
|
Cleaning up loose ends
|
Details
|
|
|
05-20-2009
|
4.00
|
Installing the sniffle valve
|
Details
|
|
|
05-19-2009
|
4.00
|
Alternator final install and wiring
|
Details
|
|
|
03-23-2009
|
4.00
|
Alternate Air
|
Details
|
|
|
01-28-2009
|
4.00
|
Lycoming FP plug and Manifold Pressure box
|
Details
|
|
|
11-05-2008
|
7.00
|
Horizontal Injection Induction System
|
Details
|
|
|
09-29-2008
|
2.00
|
Engine Stuff
|
Details
|
|
|
09-29-2008
|
3.00
|
Air Oil Separator
|
|
|
|
09-24-2008
|
4.00
|
Engine Stuff
|
Details
|
|
|
09-10-2008
|
0.50
|
Spinner
|
Details
|
 |
|
09-08-2008
|
5.00
|
Mixture control
|
Details
|
|
|
09-06-2008
|
3.00
|
Throttle Linkage
|
Details
|
|
|
09-05-2008
|
4.00
|
Making a throttle cable braket that works
|
Details
|
|
|
09-03-2008
|
4.00
|
Installing the Vetterman exhaust system
|
Details
|
|
|
09-02-2008
|
5.00
|
Installing the vetterman exhaust system
|
Details
|
|
|
08-30-2008
|
3.00
|
Mounting the engine
|
|
|
|
08-29-2008
|
3.00
|
Mounting the engine
|
Details
|
|
|
08-22-2008
|
4.00
|
Preparation for hanging the engine
|
Details
|
|
|
07-22-2008
|
2.00
|
Engine delivery
|
Details
|
 |
|
05-03-2008
|
0.20
|
Propeller
|
Details
|
|
|
03-21-2008
|
6.00
|
Motor mount installation & Wiring
|
Details
|
|