Date
|
Hours
|
Work Log Summary

|
Details

|
09-01-2007
|
3.00
|
Filling in aroung the elevator tips
|
Details
|
|
|
08-11-2007
|
2.00
|
Drilling Elevator Horn
|
Details
|
|
|
08-08-2007
|
6.00
|
Building & installing the electric trim servo
|
Details
|
|
|
07-18-2007
|
6.00
|
Working on left elevator and trim tab
|
Details
|
|
|
07-14-2007
|
2.00
|
Trim tab servo mount
|
Details
|
 |
|
07-11-2007
|
3.00
|
Rolling the left elevator leading edge
|
Details
|
 |
|
07-10-2007
|
8.00
|
Left elevator trim tab
|
Details
|
|
|
07-08-2007
|
5.00
|
Left Elevator Stuff
|
Details
|
|
|
07-07-2007
|
5.00
|
Rolling the right elevator leading edge
|
Details
|
|
|
07-06-2007
|
7.00
|
Right elevator assembly
|
Details
|
|
|
07-04-2007
|
7.00
|
Building the left elevator & primimg parts
|
Details
|
|
|
07-02-2007
|
6.00
|
Building the right elevator
|
Details
|
|
|
06-27-2007
|
7.30
|
Bending the elevator trailing edge
|
Details
|
|
|
06-14-2007
|
6.00
|
Fabricating Elevator Parts
|
Details
|
|
|
06-12-2007
|
6.50
|
Right Elevator Stiffeners
|
Details
|
|