Date
|
Hours
|
Work Log Summary

|
Details

|
07-19-2022
|
3.00
|
Attached the Rear Spar Inboard Stiffeners
|
Details
|
|
|
07-18-2022
|
4.00
|
Assembled and Drilled W-1007 C/D/E Doublers
|
Details
|
  |
|
07-17-2022
|
2.00
|
Riveted the Inboard Aileron Hinges together
|
Details
|
  |
|
07-15-2022
|
2.50
|
Assembled SB 16-03-28 for Inboard Hinge Bracket
|
Details
|
  |
|
07-09-2022
|
3.50
|
Riveted Ribs to Left Spar
|
Details
|
  |
|
07-08-2022
|
1.00
|
Inserted Bolt Hardware to the Ribs of the Left Spa
|
Details
|
  |
|
07-07-2022
|
2.50
|
Clecoed the Ribs to the Left Spar
|
Details
|
  |
|
07-06-2022
|
2.00
|
Riveted the Flap Hinges to the #3 and #8 Ribs
|
Details
|
  |
|
07-05-2022
|
10.00
|
Scuffed/Washed/Primed Ribs
|
Details
|
  |
|
06-24-2022
|
2.50
|
Attached Ribs to Left Spar, Drilled #12 Holes
|
Details
|
  |
|
06-23-2022
|
1.00
|
Deburred and Smoothed Left Spar Flap Hinge Bracket
|
Details
|
  |
|
06-21-2022
|
3.00
|
Drilled Torque Tube and Flap Brackets to Ribs
|
Details
|
  |
|
06-19-2022
|
1.50
|
Dimpled the lower flanges of the right spa ribs
|
Details
|
  |
|
06-17-2022
|
1.50
|
Dimpled lower flanges of the left spar ribs
|
Details
|
  |
|
06-16-2022
|
2.50
|
Deburred the edges of the ribs
|
Details
|
  |
|
06-15-2022
|
4.00
|
Finished Fluting all ribs
|
Details
|
  |
|
06-14-2022
|
1.00
|
Fluting W-1010 + 1011 + 1012 Ribs
|
Details
|
  |
|
06-13-2022
|
1.00
|
Separated and Processed W1029 C and W1029D
|
Details
|
  |
|
06-09-2022
|
10.00
|
Started/Completed Right Spar Preparation
|
Details
|
  |
|
06-06-2022
|
2.50
|
Countersunk Holes on Left Spar Flanges
|
Details
|
  |
|
06-04-2022
|
4.00
|
Riveted the nutplates to the left spar flanges
|
Details
|
  |
|
06-02-2022
|
3.00
|
Drilled and Countersunk the Left Spar
|
Details
|
  |
|
06-01-2022
|
2.00
|
Fabricated the J-Channels for the Left Spar
|
Details
|
  |
|
05-31-2022
|
1.00
|
Reviewed Spar Plans
|
Details
|
  |
|
05-30-2022
|
1.00
|
Strart of the RV-14A Project
|
Details
|
  |
|
04-27-2008
|
3.00
|
Inventoried the Hardware of Fininshing Kit
|
Details
|
  |
|
04-26-2008
|
1.50
|
Inventoried Finishing kit
|
|
 |