Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-A8
Wing Construction
6-9-2022
< Previous Log Entry
Next Log Entry >
Date:
6-9-2022
Number of Hours:
10.00
Manual Reference:
Brief Description:
Started/Completed Right Spar Preparation
Started/Completed Right Spar Preparation.
This included fabrication of the J-channels, match drilling the #40 holes for the nutplates then countersinking the holes.
Match drilled all of the #40 holes.
Installed the tank nutplates and the wing inspection plate nutplates.
Countersunk the wing tank and wing inspection plate holes to accept the dimpled wing skins dimpled inspection plates.
Installed rivets and nutplates in the inboard section of the spar. Installed four nutplates in the outboard spar section.
Countersunk all of the #40 holes to accept the dimpled skins.
Primered all of the spar areas that were machined.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
RV-A8 Home
Category
# Logs
# Hours
All
2277
5987
Aircraft Related
314
1351
Avionics
206
404
Brakes
11
18
Canopy
41
63
Cooling System
7
9
Cowl Flap
13
20
Cowling
146
354
Electrical System
157
311
Empennage
29
48
Engine
88
158
Fiberglass
148
316
Finishing Kit
27
76
First Flight Prep
4
1
Flight Control Syste
75
118
Flight Testing
18
20
Flights
6
7
Forward Baggage Comp
6
9
Forward Top Skin
24
36
Fuel System
84
155
Fuselage
344
812
Heating System
1
0
Inspection
5
5
Interior
24
20
Landing Gear
53
100
Lighting
17
24
Miscellaneous
8
5
None
14
6
Oxygen System
5
6
Painiting
11
28
Painting
11
28
Prop
22
27
Sensors
5
7
Testing
1
1
Ventilation
3
4
Windscreen
8
13
Wing Construction
27
76
Wings
314
1351
Copyright © 2001-2024 Matronics. All Rights Reserved.