KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  9-4-2013
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Applied One Layer 9 Oz Glass to Cowling Interior

Applied One Layer 9 Oz Glass to Cowling Interior after sanding more of the interior to remove excess material. The glass was layed for strength under so much micro appied to the outer surface to shape the cowling. The cowling was placed on the aircraft to allow the glass to cure in the shape of the installed cowling.
' style=

Peel Ply Removal 1 Day Later

Peel Ply Removal 1 Day Later

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.