KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  10-29-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Made a new #6 cable for run from Battery to VP

Made a new #6 cable for run from Battery to VP. It became apparent that the original cable didn't have enough length for the route it need to go. The wire is secured to a adel clamp on the left 200 A ANL fuse, passes through a SB375-4 snap bushing in the left vertical of the F-808 bulkhead. A 3/8" was drilled in the forward VP CU attachment bar and another SB375-4 was used to line the hole. The wire passes through this hole and is bolted to the VP CU. The wire is secure and should not interfere with future wire routing from the VP CU. I like the way that this worked out.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.