KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  2-20-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Located the parts for the Baggage Door assembly

Located the parts for the Baggage Door assembly. Studied the instructions. Will probably wait for the final assembly of the baggage door until after the aircraft is on its legs. The instructions call for climbing into the fuselage to rivet the door assembly to fix it to the shape of the opening. With the fuselage on the rotisserie, I don't want to risk any damage to the fuselage because of not having enough support strength, especially on the tail.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.