KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  4-12-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Prepped and Inspected the Aircraft for Inspection

Prepped and Inspected the Aircraft for Inspection. Secured recently installed fuel gauge signal converter. Installed labels for the cowl flap and changd the label for the Engine Bus Selection to a more appropriately noticable Yellow label.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.