KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
' style=
Date:  1-3-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Made Several Firewall Penetrations

Made Several Firewall Penetrations.

Made a 1.5" opening for the engine control cables to pass through the firewall. I attached the pass through fittings fabricated from the stainless steel hand rail. Fire Block Sealant was applied to the firewall attachment before attachment.

Installed a firewall pentration for the passing of the manifold pressure to the EIS manifold sensor that I mounted just above the heater. The space seems to be well suited to the mounting os the sensor and the pass through.
' style=

Engine Side of Pass Through

Engine Side of Pass Through

' style=

Cockpit side of Pass Through

Cockpit side of Pass Through

' style=

EIS Manifold Pressure Sensor

EIS Manifold Pressure Sensor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.