Work Logs Found: 413
Category Work Time: 975 Hours
 Date
Hours
Work Log Summary

Details

 05-28-2006
7.00
Assembled Jigs to bases
Details

 05-27-2006
5.00
Jigs Sanding and Bases
Details

 05-20-2006
2.00
Yet more jig work
Details

 04-02-2006
4.00
And more jig work
Details

 03-30-2006
1.00
More jig work
Details

 03-26-2006
6.00
Continued jig construction

 03-25-2006
3.00
Started building jigs 1 -5
Details

 03-23-2006
2.00
Built CS102/136 Assy
Details

 03-22-2006
2.00
Nose Wheel Window outer glass, install cover

 03-21-2006
0.75
Cleaned Glass Windows prepped for glassing

 03-15-2006
1.00
Installed Node Wheel Cover Windows

 03-09-2006
1.00
Trimmed and cleaned nose wheel cover

 03-07-2006
0.50
Removed Plug from cover

 03-06-2006
2.00
Completed Nose Plug and glassed

 03-05-2006
2.00
Start plug for nose wheel cover
Details

 03-04-2006
2.00
Reinstall NG3
Details

 03-04-2006
0.50
Glassed over anchors
Details

 03-02-2006
1.00
Complete Cutting Control Tubing
Details

 02-26-2006
2.00
Tape Canard Brace
Details

 02-25-2006
2.00
Install Canard Brace
Details

 02-24-2006
0.50
Start cutting tubing
Details

 02-24-2006
1.00
Layup Canard Brace/Trim Nose Doors
Details

 02-24-2006
2.00
Floxed Canard Bushings/Nutplates
Details

 02-23-2006
3.50
Nose Gear Door Stuff/Canard Brace
Details

 02-22-2006
3.00
Trim and Size Gear Doors
Details

 02-21-2006
3.00
Work on Nose Gear Doors
Details

 02-19-2006
4.00
Glass the nose bottom
Details

 02-18-2006
2.50
Nose Bottom/Strut Prep
Details

 02-17-2006
3.50
Reinstall Strut Cover, strut prep
Details

 02-16-2006
3.00
Install Noselift / Cut remaining hole for nose whe
Details

 02-15-2006
3.00
Fit/Install Strut Cover
Details

 02-08-2006
1.00
Routed nose for support wood
Details

 02-03-2006
1.50
Cut Wooden Block, Sanded Nose Foam
Details
       

 01-31-2006
2.50
Completed NG-3, NG5
Details
     

 01-30-2006
1.00
Installed Foot and NG-3
Details
       

 01-29-2006
2.00
Trimed Strut, MKNG6A, Nose Cone
Details
       

 01-28-2006
2.50
2cd Ply and Nose Buildup
Details

 01-27-2006
1.00
1st Ply on Nose Strut
Details

 01-26-2006
0.50
Prep Strut
Details

 01-24-2006
1.00
Trim Strut/Recover MKNG6A / NG15
Details

 01-22-2006
3.00
Contour Nose
Details
       

 01-21-2006
2.25
Complete Side Sanding Templates...
Details

 01-20-2006
1.25
Continued prep for contouring
Details

 01-19-2006
3.00
Contour Nose, Bore Lift Tab Mounts
Details

 01-17-2006
1.00
Nose Templates
Details
       

 01-16-2006
0.20
Continue CS109,CS118
Details

 01-15-2006
1.00
Fab K1000 Nutplates for Canard Lift Tabs
Details

 01-09-2006
0.50
Begin Fabrication of CS109, CS118 Pivot Mounts
Details

 09-26-2005
1.00
Install Pins for canard
Details
     

 09-24-2005
0.50
Continue Carving Nose

 09-23-2005
2.00
Start Carving Nose
Details
     

 09-20-2005
0.50
Install Horizontal Nose piece
Details

 09-19-2005
1.00
Glass F0
Details

 09-17-2005
3.00
Trim sides, install NG
Details
     

 09-17-2005
1.00
glass outboard elevator weights
Details

 09-16-2005
4.00
Install sides
Details

 09-15-2005
3.00
Contour inside of nose foam
Details
       

 09-10-2005
1.00
glass fronts of attach tabs
Details

 09-10-2005
8.00
Carved Bottom, install nose bottom...
Details
       

 09-09-2005
2.00
Reinstall canard attach tabs
Details
     

 09-07-2005
2.00
Cut off Attach Tabs
Details

 09-03-2005
1.00
Glass Back of Tabs
Details

 09-02-2005
1.00
Glass Front of Attach Tabs
Details

 09-01-2005
1.50
Aft Layup on tabs
Details

 08-31-2005
2.50
Install Attach tabs
Details

 08-28-2005
1.50
Trim sides for Canard Install

 08-21-2005
1.50
Flox Pads for Canard Tabs
Details

 08-17-2005
0.75
Trim Canard Mounting Area
Details
     

 08-08-2005
0.50
Install Front Assy
Details
     

 08-07-2005
0.50
Install Jig For Front Assy
Details

 08-06-2005
1.50
Trim Hole For Actuator
Details

 08-03-2005
2.00
Mount Tires / Flip over Fuse
Details
       

 08-02-2005
1.50
Trial Fit Tires/Bid Wrap
Details

 07-29-2005
0.10
Found Out About Courtney!!!
Details

 07-27-2005
3.00
Trim Glass / trial fit axles
Details

 07-26-2005
2.00
Glass and make flox pads for axles
Details
       

 07-25-2005
1.50
Align Fuselage for axles
Details

 07-21-2005
2.50
Install LB Actuator and Hardpoints
Details
       

 07-20-2005
2.50
Glass Inside of LB, remake free side ...
Details

 07-19-2005
3.00
Final Sand Adjust LB
Details

 07-17-2005
4.00
Route Foam Drill Tap and Mount LB
Details
     

 07-16-2005
2.50
Install LB Hinge Plywood
Details

 07-14-2005
1.00
Make LB brackets
Details

 07-14-2005
2.00
Cut Paper Templates for wings
Details

 07-13-2005
0.50
Trim LB
Details

 07-13-2005
0.50
Sand elevator pin tubes

 07-12-2005
1.25
Install Tubes for Elevator Pins
Details
       

 07-12-2005
0.75
fit and join landing brake
Details

 07-11-2005
2.50
Sand LG Attach tabs, trim LB,routeLB23
Details

 07-10-2005
1.75
Glass Tubes and Washers onto tabs
Details

 07-09-2005
1.50
Flox Tubes and Bushings
Details
     

 07-08-2005
3.10
Fit/Bore Hole #2 and fit tubes
Details
       

 07-07-2005
1.50
Fit/ Bore Hole the first hole
Details

 07-06-2005
3.00
Install MG1 and 2s
Details
     

 07-05-2005
2.00
Start Fitting LG Hoop
Details

 07-04-2005
6.50
Layup #2 LG BH Reinforcment
Details
       

 07-03-2005
5.00
Inside LG Attach/prep for 2cd ...
Details

 07-02-2005
3.00
3rd LG Reinforcing Layup
Details
     

 06-30-2005
1.00
Trim Attach Points
Details
       

 06-29-2005
3.00
Outer LG Attach Points MG1/2
Details
       

 06-28-2005
3.00
Jig Hoop For Attach Points
Details
     

 06-27-2005
2.00
Sand Hoop/Start Jigging
Details
     

 06-26-2005
2.00
Forward BH Reinforcement Layup
Details
     

 06-25-2005
5.00
Second Torsional Layup
Details
       

 06-23-2005
1.00
Cleanup Tape on TE
Details

 06-22-2005
2.00
Install TE/ Sand Bulkheads
Details

 06-20-2005
2.00
Sand Hoop/Install Brake Conduits
Details
       

 06-19-2005
4.50
First Torsional Layup
Details
     

 06-18-2005
2.00
Build Micro Fillets into LG bulkheads
Details
       

 06-16-2005
2.00
Sand Hold/Cut Glass for Torsional Layup
Details

 06-15-2005
2.00
Sand Hoop/Gear Hold
Details

 06-14-2005
1.00
Trim LG Strut Hoop
Details

 06-12-2005
1.50
Countour and Glass Bottom Tip
Details
     

 06-12-2005
1.50
Continue sanding landing brake bay

 06-11-2005
0.75
Start routing out LB area
Details

 06-11-2005
1.75
Glass Upper Tip
Details
     

 06-10-2005
3.00
Sand Canard Tip Upper Contour
Details
     

 06-09-2005
1.00
Install Canard Tips
Details
     

 06-08-2005
1.00
Cut Ends for Canard
Details

 06-07-2005
0.50
Fill Hinges
Details

 06-06-2005
1.50
Install Hinges
Details

 06-05-2005
1.50
Route Hinge Mount Points
Details
     

 06-04-2005
2.00
Sand Trim TE/ Elevators
Details

 02-17-2005
0.50
Glue 2cd Elevator Core
Details

 02-16-2005
0.50
Glue First Elevator Core
Details

 02-15-2005
2.50
Alodine Torque tubes
Details

 02-13-2005
0.50
final Drill and Sand of NG-30's
Details

 02-11-2005
2.00
Route NG-30 Reinforcements, Glass
Details

 02-10-2005
2.00
Glass Outside of NG-30 4 Ply
Details

 02-09-2005
0.50
Prep NG30 and install plywood HP
Details
       

 02-08-2005
0.50
Install Glass Hardpoints
Details
       

 02-07-2005
1.00
Glass New Landing Brake
Details

 02-04-2005
1.00
15 Ply Glass Layups for Hard Points
Details

 02-02-2005
0.50
Cut MG1, 2
Details

 02-01-2005
1.50
Cut aluminum for CH13
Details
       

 01-30-2005
2.00
Layup Inside NG-30s
Details
     

 01-28-2005
1.00
Glass NG31 and 32
Details

 01-27-2005
1.00
Cut plywood hardpoints for 13
Details

 01-26-2005
0.50
Cut foam for NG-31

 01-24-2005
1.00
Cut foam for NG-30
Details

 01-06-2005
1.00
Clean torque tubes
Details

 01-05-2005
1.00
Clean torques tubes
Details

 01-04-2005
1.00
Clean torque tubes
Details

 10-10-2004
8.00
Skin, spar cap, install antennas
Details
       

 10-08-2004
1.00
Fill canard
Details

 10-07-2004
2.00
Install Coax
Details

 10-06-2004
3.00
Install Foam hard points
Details

 10-03-2004
8.00
Glass bottom spar cap and skin
Details

 09-30-2004
2.00
Sand Cores spar cap areas
Details

 09-29-2004
3.00
Rework core assy
Details

 09-28-2004
3.00
Assy Canard Cores

 09-27-2004
1.00
Install lift tabs
       

 09-17-2004
1.00
Install lift tabs
     

 09-16-2004
2.00
Assy lift tab mounting plates

 09-15-2004
4.00
Assy aft cores
     

 09-14-2004
2.00
Complete jig

 09-13-2004
3.00
Build new jig

 09-11-2004
3.00
Cut new foam cores
Details

 09-01-2004
3.00
trim trailing edge

 08-31-2004
2.00
Assemble elevators, build L templates
     

 08-30-2004
3.00
Glass elevator ends, 2ply bid over
Details
     

 08-29-2004
1.00
Glass top of elevators

 08-29-2004
6.00
glass top of canard , solder antennas,
     

 08-28-2004
6.00
Glass Canard spar cap

 08-28-2004
1.00
bottom of elevator
Details

 08-27-2004
1.00
Rebuild elevator
Details

 08-26-2004
5.00
Install elevator hardpoints, antenna
Details
       

 08-25-2004
4.00
Remove T.E. foam
Details

 08-25-2004
1.00
build left elevator

 08-24-2004
3.00
sand prep canard

 08-24-2004
1.00
Build right elevator
Details

 08-23-2004
4.00
Remove fish tail, jig canard
Details

 08-22-2004
5.00
Glass Bottom of Canard
Details
       

 08-21-2004
4.00
Glass bottom spar cap
Details
       

 08-20-2004
1.00
Sand and fill Canard

 08-19-2004
1.00
install NC/2 into torque tubes
Details

 08-19-2004
4.00
Glass Shoulder support
Details

 08-18-2004
4.00
Assemble Canard cores
Details
       

 08-17-2004
2.00
Flox Lift Tabs
Details
       

 08-17-2004
2.00
cut elevator cores

 08-16-2004
3.00
Make tempates/fit canard cores

 08-15-2004
7.00
Glass Canard Shear WEB

 08-12-2004
7.00
Tape head duct
Details

 08-11-2004
2.00
Install lift tabs into canard

 08-11-2004
2.00
anchors for front seat harness
Details

 08-10-2004
5.00
Fabricate Attach tabs
Details
     

 08-09-2004
4.00
Join aft canard cores
Details
     

 08-08-2004
3.00
Cut Canard Cores
Details
       

 08-07-2004
2.00
Finish Hot Wire Tool

 08-06-2004
4.00
Build Hot Wire Tool

 08-05-2004
3.00
Finish A, B, C + D Templates
Details

 08-04-2004
1.50
Make Templates

 08-04-2004
1.50
heat duct harness attach 7 ply buildups

 08-03-2004
2.00
Glue Canard Templates to MDF
Details

 07-28-2004
6.00
Glass Fuselage Aft
Details

 07-28-2004
2.00
Glass end of spar
Details

 07-27-2004
5.00
Glass Front of Spar
Details

 07-26-2004
4.50
Install heat duct/shoulder support
Details
     

 07-25-2004
3.00
Rebuild NACA area
Details

 07-25-2004
6.00
Outside spar shear web
Details

 07-24-2004
4.00
Sand aft section, polyurethan foam
Details

 07-23-2004
5.00
Build up fwd bulkhead
Details

 07-22-2004
4.00
install 6 ply bid...
Details

 07-21-2004
3.00
Sand Spar
Details

 07-20-2004
7.00
Lower Spar cap
Details

 07-19-2004
12.00
Upper Spar Cap
Details
     

 07-18-2004
8.00
Shear Web for Spar
Details
       

 07-17-2004
7.00
Finish contouring spar/install outer hardpoints
       

 07-15-2004
3.00
Contour Spar
Details

 07-14-2004
3.00
Sand Spar/contour
Details

 07-13-2004
3.00
Installed FWD Lower Bulkhead
Details

 07-12-2004
3.00
Applied top to spar
       

 07-11-2004
10.00
Glassed inside of spar
       

 07-10-2004
1.50
Glassed front / fwd BH
Details

 07-10-2004
1.50
cut new inside hardpoints for spar

 07-09-2004
3.00
Removed FWD BH
Details

 07-09-2004
1.50
Recut foam for the fwd lg bulkhead
Details

 07-08-2004
1.50
Reinstall upper forward lg bulkhead

 07-08-2004
3.00
Microed top of spar

 07-07-2004
4.50
installed lwr fwd bh
Details

 07-06-2004
4.50
Installed Aft Bulkhead and C + D plywood
Details

 07-05-2004
6.00
Cut Spar foam

 07-04-2004
4.00
Finished jig

 07-03-2004
4.00
Coninue new spar jig

 07-02-2004
4.00
Started new jig

 07-01-2004
5.00
Spar is dead rebuild...ouch
Details

 06-30-2004
2.00
glass aft side of LG bulkheads

 06-30-2004
3.00
finished top spar cap trough

 06-29-2004
2.00
Glass front of LG Bulkheads
Details

 06-29-2004
3.00
bottom spar cap trough...
Details

 06-28-2004
2.50
Made some sanders
Details

 06-28-2004
0.50
cutout foam for landing
Details

 06-27-2004
3.00
bevel front of spar
Details

 06-24-2004
2.50
Epoxy hardpoints and cut glass
Details

 06-23-2004
3.50
Glass landing gear hardpoints
Details

 06-22-2004
3.00
glass front face of spar
Details

 06-21-2004
4.00
trim spar and inner wing mount hardpoint
Details
     

 06-19-2004
5.00
Fix spar end, end layups
Details

 06-18-2004
4.00
rebuild spar end, cut out LG bulkhead
Details

 06-15-2004
1.50
right side inner spar attach points
Details

 06-12-2004
5.00
inside harness attach point
Details
       

 06-11-2004
3.00
install canopy hinges and 6mm ply harnes
Details

 06-10-2004
2.00
Cut out new landing gear bulkheads
Details

 02-23-2004
1.00
Glass edges of head rests

 02-21-2004
0.50
Sand faces of Headrests
Details

 02-18-2004
1.00
Glass faces of headrests
Details

 02-14-2004
0.50
Sand edges of Headrests
Details

 02-11-2004
0.50
Assemble seatback brace
Details

 02-09-2004
1.00
Assemble headrests
Details

 02-07-2004
0.50
Trim Headrest parts
Details

 02-06-2004
0.75
Glass inside edges of headrests
Details

 01-21-2004
0.50
Layout Headrest parts
Details

 09-01-2003
1.00
Sand Joints
Details

 08-30-2003
2.00
Assemble Spar foam U Channel
Details

 08-29-2003
0.50
Sand impressions for spar foam
Details

 08-28-2003
2.00
Cut foam for Spar

 08-26-2003
3.00
Measure foam for Spar
Details

 08-25-2003
1.00
Cut Wing hardpoints for Spar
Details

 08-24-2003
3.00
Build jig for center section spar
Details

 08-23-2003
3.00
Layup Fuelage fix
Details

 08-22-2003
4.00
Aft Reinforcements/Finish Plug
Details

 08-21-2003
2.00
Sanding and Plug for Fuel valve
Details
     

 08-19-2003
3.00
Complete inside joint taping
       

 08-18-2003
2.00
Tape inside joints
Details
     

 08-17-2003
2.00
Tape inside joints
Details
     

 08-16-2003
6.00
Glass fuselage side
Details

 08-15-2003
2.00
Prep opposite side for glassing
Details

 08-12-2003
1.00
Continue sanding
Details

 08-11-2003
1.00
Sand joints on sides
Details

 08-10-2003
6.00
Glass the fuselage side
Details
       

 08-09-2003
2.00
Prep Side
Details

 08-07-2003
4.00
Contour Sides
Details
       

 08-05-2003
4.00
Construct A Frames
Details

 07-27-2003
6.00
Glass Bottom of Fuselage
Details
       

 07-23-2003
0.50
General Sanding of Fuselage Bottom
       

 07-22-2003
1.00
Fill/Sand Fuselage Bottom

 07-21-2003
1.00
reinstall fwd upper lg bulkhead

 07-21-2003
1.00
Filling MKR BCN/SCOOP
Details

 07-20-2003
6.00
NACA Scoop/MKR BCN
Details
       

 07-18-2003
2.00
Sand NACA Scoop
Details

 07-17-2003
1.00
Redo NACA Foam
Details

 07-16-2003
1.00
Remove NACA Scoop
Details

 07-15-2003
1.00
Sand Foam Added for the NACA droop
Details

 07-14-2003
1.00
General Sanding Prep

 07-13-2003
4.00
Sanding/Prep of Bottom, Grooves
Details

 07-11-2003
1.00
Forming Lower Gear Corners
     

 07-10-2003
2.00
Build up of Gear cover
Details

 07-09-2003
1.50
Permenant installation of flat gear cove
Details
       

 07-08-2003
2.00
Install center of 8"
Details

 07-07-2003
1.00
Contour corners between Firewall and aft
Details
     

 07-02-2003
3.00
Install foam for the aft corners
Details
       

 07-01-2003
2.00
Plywood installed for aft corners
Details

 06-30-2003
1.00
Finish work on aft bulkhead
Details

 06-29-2003
7.00
Contour right side
Details
     

 06-28-2003
7.00
Finsih left side contour
Details
       

 06-27-2003
5.00
Start contouring left side
Details
       

 06-24-2003
1.00
Start Contouring NACA scoop
Details
       

 06-23-2003
2.00
Install foam for the naca scoop
Details
     

 06-22-2003
6.00
Glass inside of bottom and install
Details
       

 06-21-2003
6.00
Sanded buildup tape joints
Details

 06-20-2003
3.00
Micro foam/install fwd firewall glass
Details

 06-19-2003
4.00
Installed new foam
Details

 06-18-2003
1.50
Glass prep
Details

 06-15-2003
3.00
Sanding install upper fwd fuselage
Details

 06-14-2003
4.00
Finish build up of last a foam
Details
       

 06-13-2003
10.00
Bottom Prep
Details
       

 06-11-2003
2.00
Install Fwd Gear Bulkhead
Details
     

 06-10-2003
3.00
Install Lwr Firewall/Heat Duct
Details
       

 06-09-2003
4.00
Fixup Electrical channel
Details

 06-07-2003
2.00
Cleanup Taped Joints/F28
Details

 06-05-2003
5.00
Tape Joints
Details

 04-26-2003
2.00
Heat Duct outer layup
Details

 03-14-2003
1.00
Trim/Assemble Aft Heat Duct
Details
     

 03-13-2003
0.50
Layup Baffle side two
Details

 03-12-2003
1.00
Inside Head duct layup
Details

 03-09-2003
0.50
Trimming Heat Duct
Details
     

 03-09-2003
0.50
sand rear harness attach tubes
Details

 03-06-2003
0.50
Rear Heat duct pieces
Details
     

 03-01-2003
2.00
Trim Exterior layups of keel/seatback
Details

 02-27-2003
3.00
Glassed keel
Details

 02-26-2003
1.00
Glass outside of brace
Details
     

 02-25-2003
2.00
Trim Valve support/install
Details
     

 02-24-2003
0.50
Layup for Valve Support
Details

 02-23-2003
0.50
Assemble Seat support
Details
     

 02-22-2003
0.50
Prep Seatback spacers
Details

 02-21-2003
0.50
Installed wooden triangles
Details
     

 02-10-2003
0.75
Glass Map Pocket Sides
Details
     

 02-09-2003
1.00
Prep/assemble keel
Details
       

 02-08-2003
1.00
Trimmed Landing Gear Bulkheads
Details

 02-08-2003
0.50
Trimed spacers and keel
Details

 02-07-2003
1.00
Glass inside of Center keel
Details
     

 02-06-2003
1.25
Opposite layup of R LG BH
Details

 02-05-2003
1.00
Glassed opposite Fwd Upper BH

 02-04-2003
0.60
Glassed opposite side of Fwd Lower BH

 02-03-2003
0.75
Glassed opposite side of spacers
     

 02-01-2003
0.50
Trim Map Pocket Spacers
Details

 02-01-2003
1.50
Trim Fwd Face of Bulkheads
Details

 01-31-2003
0.50
Glassed map pocket spacers
Details
     

 01-30-2003
0.50
Cut out parts for center keel
Details
     

 01-29-2003
0.75
Glass Fwd Face of Rear LG BH
Details
     

 01-28-2003
1.00
Glass Fwd Face of Upper Front LG BH
Details
     

 01-27-2003
0.75
Glass Fwd Face of Lower Front LG BH
Details

 01-26-2003
0.50
Glass for mouning Fuel Valve
Details
       

 01-24-2003
0.50
Cut Glass for landing gear bulkheads
Details

 01-23-2003
1.00
Build up of landing gear bulheads
Details

 01-22-2003
0.50
Cut Replacement Hardpoint foam
Details
       

 01-18-2003
0.50
Cut Fuel Selector Plywood Mounts
Details

 01-17-2003
0.50
Templates for Plywood Reinforcement
Details

 11-03-2002
0.75
Join F22
Details

 11-01-2002
1.00
Jig Fuselage
Details

 09-29-2002
1.50
Fuselage Fitting
Details
       

 09-29-2002
2.00
Fuselage Fitting
Details
     

 09-27-2002
2.00
Fuselage Jig
Details

 09-22-2002
3.00
Final Trim of Spar Support and Aft
Details

 09-20-2002
3.00
Trimming and Sanding of sides
Details
       

 09-18-2002
2.00
Spar Support Layup
Details
       

 09-17-2002
1.50
Left Side Elec. Ch Buildup
Details
     

 09-16-2002
1.50
Right Side Elec. Ch Buildup
Details
     

 09-15-2002
3.00
LWX and LWY and Elec Channel
Details
       

 09-14-2002
1.50
Lower Longeron Doublers/Elec Channel.
Details
     

 09-13-2002
4.00
Upper Longeron Layup
Details
     

 09-12-2002
2.00
Lower Longeron Installation cont
Details
     

 09-11-2002
2.00
Lower Longeron (Left Side)
Details
       

 09-10-2002
2.00
Side preparation
Details
       

 09-08-2002
5.00
Layup of Fuselage Sides
Details
       

 09-07-2002
1.50
Sanded Fuel Site Gauge Depressions
Details
     

 09-06-2002
2.00
Sand Sides
Details

 09-05-2002
2.00
Micro joints layup prep
Details
       

 09-04-2002
1.00
Completed installing build ups
Details

 09-03-2002
0.75
Fuselage build up continued 3/4"
Details

 09-02-2002
1.00
Continue attaching 3/4 side pieces
Details
     

 09-01-2002
4.00
Trimmed risers for fuselage sides
Details
       

 08-31-2002
4.00
Dishing of Control Stick depressions
Details
       

 08-30-2002
3.00
Foam Sides
Details
       

 08-29-2002
3.00
Side Templates
Details

 08-28-2002
1.50
Side Templates
Details
       

 08-26-2002
0.50
Trimmed Instr Pnl Stiffeners
Details

 08-26-2002
1.00
Cleanup and Side Templates
Details

 08-25-2002
2.00
Stiffener Layup two
Details

 08-24-2002
4.00
Instrument Pnl Trim/Hole Cuts/Stiffener
Details
     

 08-22-2002
1.50
Instrument Panel Fwd Layup
Details

 08-21-2002
0.75
Instrument Panel Trim
Details

 08-20-2002
1.50
Instrument Panel Aft Layup
Details

 08-19-2002
1.75
Sand Longerons
Details

 08-19-2002
0.75
Recut instrument panel foam
Details

 08-18-2002
1.50
Install longerons doublers
Details
       

 08-17-2002
1.50
Laminate Longerons
Details
     

 08-16-2002
4.00
Fuselage Jigs/Cut Spruce for longeron
Details
     

 08-15-2002
1.50
Fuselage Side Jigs
Details
       

 08-15-2002
0.50
Continue Trimming of F22
Details

 08-14-2002
0.10
Fix Table and Rework Glass cutting Table
Details

 08-13-2002
1.50
Try to salvage Instr. Panel
Details

 08-12-2002
2.00
F22/Firewall Trimming
Details

 08-11-2002
5.00
Aft firewall and Istr. Panel Layups
Details
     

 08-10-2002
5.00
Drill Firewall Screws, Fwd Layup of F22
Details

 08-09-2002
3.00
Instrument Panel Layup
Details
     

 08-08-2002
1.50
FWD firewall layups
Details

 08-07-2002
2.00
Glass cutting for remaining parts
Details

 08-06-2002
2.50
Firewall Cutouts and Hardpoints
Details
     

 08-05-2002
2.00
Temp Firewall and Eng Mount Holes
Details

 08-04-2002
2.00
Cut out firewall parts
Details
       

 08-03-2002
3.00
Trim aft face of F22
Details

 08-02-2002
4.00
F22 aft layup, Instrument Panel Prep
Details
       

 08-01-2002
4.00
Seatback trimming and F22 prep
Details
       

 07-31-2002
7.00
Cut and layup seatback aft
Details

 07-21-2002
3.50
Layup Fwd Face of seatback
Details
     

 07-17-2002
0.75
Complete F28
Details
     

 07-16-2002
1.50
Trim and Layup Fwd face F28
Details

 07-15-2002
1.50
Aft F28 Layup
Details
       

 07-13-2002
3.00
Assemble F22, continue Instr. Panel Cuts
Details
       

 07-12-2002
1.00
Cutting Instrument Panel
Details
     

 07-10-2002
0.50
Cut F28
Details

 07-07-2002
5.00
Cut foam for F22, Doubler, Seatback...
Details
       