KitLog pro

Powered By Kitlog Pro v2.0

Woody's Web site
' style=
Date:  6-13-2003
Number of Hours:  10.00
Manual Reference:  6.3
Brief Description:  Bottom Prep

Several things were done. The bottom was prepped. 3/8 Dinylcell Foam was joined and cut to size. I accidentally substituted 4.5lb last a foam with a lower desity on the edge buildup. Started cutting and installing the correct foam for the inside as well. Installed foam to level the all of the edges as well
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.