Powered By Kitlog Pro v2.0
Woody's Web site
Cozy MK IV
All
6-27-2005
< Previous Log Entry
Next Log Entry >
Date:
6-27-2005
Number of Hours:
2.00
Manual Reference:
9.3
Brief Description:
Sand Hoop/Start Jigging
Larry helped out on this one as well. We started by building the vertical board to layuout all of the dimensions and then built up the box ont top of the strut. Once the box was secured to the strut the box was moved to the top of the table.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pitts Model 12 Home
Cozy MK IV Home
Category
# Logs
# Hours
All
413
977
Bulkheads
49
103
Canard
36
122
Canard Install
14
19
Center Section Spar
34
136
Controls
4
2
Courtney
1
0
Elevators
27
38
Fuselage Assembly
46
99
Fuselage Exterior
35
105
Fuselage Sides
30
70
Headrests, Heat Duct
22
39
Main Landing Gear an
46
100
Miscellaneous
4
9
Nose and Nose Gear
57
105
Wings
8
30
Copyright © 2001-2024 Matronics. All Rights Reserved.