KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
Work Logs Found: 66
Category Work Time: 128 Hours
 Date
Hours
Work Log Summary

Details

 03-19-2017
4.00
Dog House - Hidden Hinge
Details
       

 03-18-2017
2.00
Rework the canard saddle
Details

 03-08-2017
3.00
Glassed (fabricated) the canard torsion tabs.
Details

 02-28-2017
2.00
Canard attachment lay-up prep
Details
       

 02-26-2017
1.00
Popped off Dog-House
Details
       

 02-25-2017
2.00
Hatch Hinge
Details
       

 02-25-2017
2.00
Hatch Hinge
Details
       

 02-25-2017
5.00
Doghouse layups
Details
       

 02-22-2017
1.50
Canard "left off"
Details

 02-20-2017
3.50
Canard alignment and drilling
     

 02-19-2017
4.00
Layup reinforcements for canard
Details
       

 02-18-2017
3.00
Elevator repair - Part 1
Details
       

 02-12-2017
2.00
Trim Hatch
Details
       

 02-12-2017
2.00
Lay-up cover for front of keel
Details
       

 02-08-2017
2.00
Hatch hinge layout
Details
     

 02-04-2017
3.00
Preliminary fit to fuse
Details
       

 02-02-2017
1.00
Elevator hinge screws
Details
       

 01-29-2017
2.00
Elevator counter weights
Details
       

 01-28-2017
4.00
Drill bushings and countersink
Details
       

 01-24-2017
1.00
Trim right elevator to correct length
Details

 01-23-2017
1.50
Canard
Details

 01-22-2017
3.00
Move engine to storage unit
Details
       

 01-22-2017
2.00
Elevator Hinges and Initial Rigging
Details

 01-19-2017
2.00
Bore Scope
Details

 01-02-2017
2.00
Canard Center Hinge
Details

 01-01-2017
3.00
Bond Hinges to Canard
Details

 12-31-2016
3.50
Bond elevator hinges
Details

 12-30-2016
0.00
New to me Engine...!
Details
       

 12-30-2016
3.50
Begin install elevator hinges
Details

 12-29-2016
2.50
Trim trailing edge of canard
Details

 12-28-2016
2.50
Machined canard hinges
Details

 12-23-2016
4.00
Attach hinges to 2x seats
Details

 12-22-2016
2.50
Aileron torque tube attachment
Details

 12-21-2016
3.00
Rework of seat hardpoints / Keel airleron bearing
Details

 12-18-2016
2.50
Glass LHS gear bushings
Details
       

 12-17-2016
2.00
Glass-in RHS gear bushings
Details
       

 12-11-2016
3.00
Glue in main gear bushings
Details

 12-10-2016
2.00
Final prep for gluing-in landing gear bushings
Details

 12-07-2016
1.50
Finish drill LHS gear mount
Details

 12-04-2016
1.00
LHS mian gear attachment
Details

 12-03-2016
1.50
Locate and drill pilot holes for LH side gear bolt
Details
       

 10-30-2016
2.50
Install 2" flange to warm-air duct
Details

 10-29-2016
2.00
Lay-up patch to cover 1.75" warm-air vent hole
Details

 10-23-2016
0.50
Lay-up patch to cover 2x 1.5" holes in oil-cooler
Details

 10-22-2016
3.00
Warm-air ducting
Details

 10-18-2016
2.00
Prime small aluminum parts.
Details

 10-16-2016
1.50
Prep various aluminum parts for primer. Treat with
Details

 10-15-2016
1.50
Locate and drill rudder pedal bellcrank support br
Details

 10-12-2016
2.00
Second layer glass on oil cooler flange. Locate an
Details

 10-10-2016
1.00
Sand interior of nose section and oil cooler bypas
Details

 10-09-2016
1.00
Glass (fabricate) oil cooler attachment flange
Details

 10-08-2016
2.50
Remove masking tape from windows
Details

 10-06-2016
0.50
Remove masking tape from windows
Details

 10-02-2016
3.00
Remove masking tape from windows
Details

 09-10-2016
4.00
Inventory small parts, begin clean tape residue fr
Details

 09-09-2016
0.00
Truck wings to Piqua
Details

 09-05-2016
3.00
Inventory a photograph parts
Details
       

 09-04-2016
0.00

Details
       

 09-04-2016
0.00

Details
       

 09-04-2016
0.00

Details
       

 08-07-2016
0.00

Details
       

 08-07-2016
0.00

       

 08-07-2016
0.00

       

 08-07-2016
0.00

       

 08-07-2016
0.00

Details
       

 08-07-2016
0.00

Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.