Rotated fuselage in the garage to make room for initial fitment of the the canard. Leveled the fuse and dropped the carnard in (with help from Amelia). Checked basic incidence and levelness. Trimmed IB end of left elevator to clear side of fuse.
Discovered problem with left elevator with poor bond to aluminium tube about 70% of the length. Will review with Factory for options fo fix.