KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
' style=
Date:  2-4-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Preliminary fit to fuse

Rotated fuselage in the garage to make room for initial fitment of the the canard. Leveled the fuse and dropped the carnard in (with help from Amelia). Checked basic incidence and levelness. Trimmed IB end of left elevator to clear side of fuse.

Discovered problem with left elevator with poor bond to aluminium tube about 70% of the length. Will review with Factory for options fo fix.
' style=

Fully articulating canard/elevator assembly

Fully articulating canard/elevator assembly

' style=

Apparent de-lam. on left elevator

Apparent de-lam. on left elevator

' style=

Other areas of delam on lower left elevator

Other areas of delam on lower left elevator

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.