KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE

Builder:
David Brook
Location:
Park City, Utah -
Aircraft:
Van's Aircraft, Inc - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
- IO-360
Prop:
-
Total Build Time:
506 Hours

Welcome to my experimental aircraft Web site. I am building a Van's Aircraft RV-8 with my son Parker, a third year Mechanical Engineering student at the University of Utah. Unfortunately his curriculum and my work schedule have limited the amount of time we have actually been able to build together. However we are both very enthusiastic about the project. I have always been interested in general aviation and building an airplane has been something I have been considering for a number of years. My aviation background is very diverse, earning my private, instrument and commercial at and early age. Entered the Air Force after college flying KC-135s, and now have 24 years with an airline, currently a captain flying the 737. With all the kids out of the house, I decided it was time to pull the trigger and let the endeavor begin.

Recent Activity
 Date Hours Work Log Summary Details
 01-19-2018
4.0
Finishing The Avionics Shelves.
Details
       

 01-18-2018
1.0
Fabricate A Second Avionics Shelf.
Details
     

 12-14-2017
2.5
Fabricating The Second Avionics Shelf.
Details
       

 12-08-2017
3.5
Fabricating The Avionics Shelf.
Details
       

 12-01-2017
4.0
Fabricate Avionics Shelf For Transponder, GAD-29
Details
       

 11-24-2017
3.5
Fabricate A Mounting Shelf For The GMU-11
Details
       

 11-13-2017
6.0
Avionics Access Door Part 4
Details
       

 11-13-2017
2.0
Avionics Access Door Part 3
Details
       

 11-12-2017
2.0
Avionics Access Door Part 2
Details
       

 11-12-2017
6.0
Avionics Access Door Part 1
Details
       










Copyright © 2001-2018 Matronics. All Rights Reserved.