KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE

Builder:
David Brook
Location:
Park City, Utah -
Aircraft:
Van's Aircraft, Inc - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
- IO-360
Prop:
-
Total Build Time:
415 Hours

Welcome to my experimental aircraft Web site. I am building a Van's Aircraft RV-8 with my son Parker, a third year Mechanical Engineering student at the University of Utah. Unfortunately his curriculum and my work schedule have limited the amount of time we have actually been able to build together. However we are both very enthusiastic about the project. I have always been interested in general aviation and building an airplane has been something I have been considering for a number of years. My aviation background is very diverse, earning my private, instrument and commercial at and early age. Entered the Air Force after college flying KC-135s, and now have 24 years with an airline, currently a captain flying the 737. With all the kids out of the house, I decided it was time to pull the trigger and let the endeavor begin.

Recent Activity
 Date Hours Work Log Summary Details
 06-01-2017
3.0
Rear Rudder Pedal installation
Details
       

 05-31-2017
3.5
final instal rudder pedals
Details
       

 05-24-2017
2.0
Static system and tail light.
Details
       

 05-23-2017
1.0
Pitot Static Ports installation.
Details
       

 05-22-2017
1.0
Cut the plywood backboards
Details
     

 05-09-2017
1.5
Trimming, match drilling rudder cable fairings.
Details
       

 05-09-2017
1.5
Bulhead Gussets and tie down ring retainer.
Details
       

 05-04-2017
1.5
Rear baggage bulkhead, Canopy Rail Receptacle.
Details
       

 05-04-2017
2.0
Attach the 4 aft bulkheads
Details
       

 05-03-2017
1.0
Flap actuator and flap motor assembly
Details










Copyright © 2001-2017 Matronics. All Rights Reserved.