KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log

Builder:
David Macdonald
Location:
Sugar Land, TX - USA
Aircraft:
Vans Aircraft - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
1593 Hours

Welcome to my RV-10 experimental aircraft builders log.

I have started building my empennage with the help of the 8 day Empennage class at Synergy Air in Eugene, Oregon. This was an excellent way to get started, in order to be certain I am doing this right and to get the chance to try a variety of tools and techniques prior to ordering my tools.

I will be posting log pages and photos as I proceed with the build.

I am recently retired after a 41 year career as a Project Manager on major capital projects. Having retired, I now have the time to build the Van's RV-10 kit as a nearly full time job, allowing for completion in a reasonable amount of time.

Dave

Recent Activity
 Date Hours Work Log Summary Details
 11-30-2017
1.0
Compressor Final Fitting
Details

 11-30-2017
5.0
A/C Compressor Mounting
Details

 11-29-2017
3.5
Door Switch Wiring
Details

 11-29-2017
3.0
A/C Compressor Installation Started
Details

 11-28-2017
6.5
Engine Baffle Prep And Cowling Prep. Door Switch
Details

 11-22-2017
4.0
Baffles Install & Cowl Trim
Details

 11-21-2017
7.3
Baffles Fabrication & Installation
Details

 11-20-2017
2.0
Panel Design
Details

 11-20-2017
5.5
Engine Baffles
Details

 11-17-2017
7.3
Engine Baffles Fabrication
Details










Copyright © 2001-2017 Matronics. All Rights Reserved.