KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log

Builder:
David Macdonald
Location:
Sugar Land, TX - USA
Aircraft:
Vans Aircraft - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO-540
Prop:
MT
Total Build Time:
2821 Hours

Welcome to my RV-10 experimental aircraft builders log.

I have started building my empennage with the help of the 8 day Empennage class at Synergy Air in Eugene, Oregon. This was an excellent way to get started, in order to be certain I am doing this right and to get the chance to try a variety of tools and techniques prior to ordering my tools.

I will be posting log pages and photos as I proceed with the build.

I am recently retired after a 41 year career as a Project Manager on major capital projects. Having retired, I now have the time to build the Van's RV-10 kit as a nearly full time job, allowing for completion in a reasonable amount of time.

Dave

Recent Activity
 Date Hours Work Log Summary Details
 10-11-2019
5.5
Installed Pitch Servo For Autopilot
Details

 10-10-2019
6.5
Install Rudder Lower Fairing & Empennage Fairing
Details

 10-09-2019
7.0
Wing Root Fairings, Fuel Strainers
Details

 10-08-2019
6.5
Installed Rudder Cable Fairings. Wing Root Fairin
Details

 10-07-2019
7.5
Empennage Fairing
Details

 10-04-2019
6.8
Fairing Nutplates Installation
Details

 10-03-2019
7.8
Drill & Trim Stab Fairing, Drilling For Nutplates
Details

 10-02-2019
6.8
Re-attached & Adj. Trim Tabs, Fairing Fitting
Details

 10-01-2019
4.3
Cut Shelves And Cleaned Out Richmond Shop
Details

 09-30-2019
6.0
Re-Install Rudder & Elev. Trim Cables
Details










Copyright © 2001-2019 Matronics. All Rights Reserved.