KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  7-18-2016
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Filled Leading Edge Guide Holes

In order to fill the 2 small holes in each wing leading edge (placed in the left wing to locate the stall warning sensor), removed the fuel tank, filled the holes with AN3 rivets, and then re-installed the fuel tank. Total time to fill the 4 holes was 5 hours!

Began installation of the Flap Gap Fairing and Aileron Gap Fairing on the left wing, fabricating the Flap Gap Stiffener, match drilling all the holes and deburing them.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.