KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
Work Logs Found: 25
Category Work Time: 93 Hours
 Date
Hours
Work Log Summary

Details

 02-15-2019
3.50
Fabricated and installed nut plates
Details
       

 02-14-2019
4.50
Right side empennage inspection panel
Details
     

 02-13-2019
4.20
Finished the left panel and started the right one
Details
       

 02-12-2019
4.00
Begin forming inspection panel
Details
     

 08-06-2018
1.50
Finished contouring the tail feathers
Details

 08-05-2018
1.00
Added material to top of VS
Details
 

 07-25-2018
4.00
Adding and carving end pieces
Details
       

 07-09-2018
5.50
Finished rib install
Details
     

 07-08-2018
4.00
Installed elevator and HT ribs
Details
     

 07-04-2018
7.00
Began fitting the ribs in the HT
Details
       

 07-03-2018
0.80
Began the rib install process on the HT
Details
 

 06-10-2018
2.00
Installed access panel mounting flanges
Details
     

 06-09-2018
1.00
Fabriated mounting flanges
 

 06-08-2018
2.00
Varnished the ribs
Details

 06-04-2018
6.50
Finished the VS and rudder
Details
       

 06-03-2018
4.50
Completed rudder and began HT and elevator
Details

 06-02-2018
5.90
Prepared the HS and elevator for installation
Details

 05-30-2018
4.50
Finished VS trailing edge and begin rudder LE
Details
     

 05-29-2018
3.20
Installed floor boards and VS coving
Details
       

 05-27-2018
2.90
Installed ribs in rudder
Details
     

 05-26-2018
2.30
Rudder rib install process
Details
 

 05-25-2018
3.00
Applied poly to the floor boards and added to ribs
Details

 05-24-2018
2.50
Installed ribs in VS
Details
 

 05-23-2018
4.50
Begine adding VS intermediate ribs
Details

 05-22-2018
8.00
Rudder install
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.