Powered By Kitlog Pro v2.0
Darrel's Kitfox - SS7
DEW2
Empennage
2-14-2019
< Previous Log Entry
Next Log Entry >
Date:
2-14-2019
Number of Hours:
4.50
Manual Reference:
Final Assembly
Brief Description:
Right side empennage inspection panel
Fabricated and installed right side empennage inspection panel. (Just copied the cut and additional plate made for the left side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
H-5 Home
DEW2 Home
Category
# Logs
# Hours
All
645
3504
Avionics
39
206
Basic Kit
3
14
Empennage
25
227
Engine
2
7
Engine
33
217
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
771
Inspection
1
1
Kitfox Avionics
39
206
Kitfox tooling
6
14
Kitfox Undercarriage
11
58
Kitfox wings
64
441
Lighting
2
12
Miscellaneous
26
120
Modifications
11
21
Paint System
86
330
Tooling
2
0
Tooling
6
14
Tools
2
0
Undercarriage
11
58
Wings
2
5
Wings
64
441
Copyright © 2001-2026 Matronics. All Rights Reserved.