Powered By Kitlog Pro v2.0
Darrel's Kitfox - SS7
DEW2
Empennage
2-14-2019
< Previous Log Entry
Next Log Entry >
Date:
2-14-2019
Number of Hours:
4.50
Manual Reference:
Final Assembly
Brief Description:
Right side empennage inspection panel
Fabricated and installed right side empennage inspection panel. (Just copied the cut and additional plate made for the left side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
H-5 Home
DEW2 Home
Category
# Logs
# Hours
All
634
2725
Avionics
39
146
Basic Kit
3
14
Empennage
25
211
Engine
33
130
Engine
2
7
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
681
Inspection
1
1
Kitfox Avionics
39
146
Kitfox tooling
6
14
Kitfox Undercarriage
11
37
Kitfox wings
64
261
Lighting
2
12
Miscellaneous
25
88
Modifications
11
21
Paint System
87
335
Tooling
2
0
Tooling
6
14
Tools
2
0
Wings
2
5
Wings
64
261
Copyright © 2001-2023 Matronics. All Rights Reserved.