KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  1-22-2021
Number of Hours:  2.00
Manual Reference:  Plexiglass install
Brief Description:  Prep plexiglass and canopy rail

Starting down a path that requires continuation.

Taped up the plexiglass and caopy frame rail for bonding.

I preped/scuffed up the plexiglass edge where the adjesive will bond to the canopy rail. I also scuffed up the canopy powder coating. Cleaned the surface with alcohol. Applied the Sika Aktivator 100 to both surfaces. (Data sheet called for min 10 min and maximum 2 hours until applying primer.
Waited an hour and applied the Sika 209D primer to both the canopy and the frame rail. (per the data sheet I had a maximum of 24 hours to apply the Sikaflex 295uv. So I left the frame and canopy in Jennifer's art studio to keep the temperature of the plexiglass at 72 degrees.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.