Brief Description: Bottom skin and tank attachment
Lined up the marked locations and drilled the overlaping bottom skin between wings and fuselage. Drilled the #30 holes between the two in preparation for the screw locations
Layed out the 863 tank brackets and started fabricating the brackets. Band saw struggled though the thick C channel material. (Went in search of new band saw blades, no luck I'll have to order one on line)