KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  2-21-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Bottom cowl to fuselage attachment

The whole process of installing the cowl onto the fuselage sides took lots longer than I had anticipated, but like everything else that comes with few instructions, its a learning experience. I have decided to install 4 camlocks on each vertical side of the fuselage, and I am still debating if I should install 3 or 4 camlocks across the top or horizontal section of the fuselage. tomorrow night I will finish installing the camlocks on the right side of the fuse and then onto the top.
' style=

Right edge of fuse marked on cowl, back drilled and clecoed in place

Right edge of fuse marked on cowl, back drilled and clecoed in place

' style=

Left side after marking edge of fuse on cowl etc. with camlocks installed

Left side after marking edge of fuse on cowl etc. with camlocks installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.