KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
Work Logs Found: 46
Category Work Time: 102 Hours
 Date
Hours
Work Log Summary

Details

 12-15-2006
1.00
Right side flashing nutplates
Details

 12-14-2006
1.50
SIde flashing nut plates
Details
       

 12-04-2006
0.20
Nose gear bungee
Details
       

 11-23-2006
1.50
Etch Priming parts
Details
       

 11-21-2006
1.00
Right NACA duct installed
Details
       

 11-19-2006
1.00
Installed left NACA duct
     

 10-14-2006
4.00
Repair of front flashing angle
Details
       

 10-12-2006
8.00
Canopy rails
Details
       

 10-03-2006
0.50
Nose gear stop plate
Details
       

 08-24-2006
2.00
Seat bottoms and seat belt brackets
Details
       

 08-24-2006
3.00
Flap motor bracket and torque tube
Details
       

 08-17-2006
2.00
Control Stick torque tube
Details
       

 08-15-2006
2.00
Upper Fuse Longeron Doubler
Details
       

 08-06-2006
2.00
Left and right seat belt attachment brackets
Details
       

 08-06-2006
2.00
Bottom seat stiffener and flap motor support
Details
       

 08-05-2006
4.00
Rear spar supports and seat supports
Details
       

 08-05-2006
3.00
Front seat pannels and spar access covers
Details
       

 08-04-2006
2.00
Nose gear and front seat pannel
Details
       

 08-03-2006
1.50
Front seat supports
       

 08-02-2006
4.00
Nose gear
Details
       

 08-01-2006
2.00
Trim side skins, rivet right side of fuse
Details
       

 07-30-2006
0.00
Putting it back together
Details
       

 07-30-2006
7.00
Disassemble front fuse
Details
       

 07-29-2006
4.00
Disassemble left side
Details

 07-28-2006
0.50
Bottom front L angles
Details
       

 07-25-2006
2.50
Back drilled front side skins
Details
       

 07-22-2006
3.00
Forward fuse horizontal supports
Details
       

 07-22-2006
2.00
Center spar supports
Details
       

 07-21-2006
5.00
Landing gear brackets
Details
       

 07-20-2006
2.00
Leveling fuse
Details
       

 07-19-2006
2.00
Moving fuse off the bench
Details

 07-17-2006
4.00
Finished left and right front fuse skins
Details
       

 07-16-2006
3.00
Front left side skin
Details
       

 06-29-2006
2.00
Installed firewall and level fuse
Details
       

 06-29-2006
2.00
Engine mounts and longerons attached
Details
       

 06-29-2006
1.00
Engine mounts
       

 06-29-2006
1.00
Adding supports to the firewall
Details
       

 06-27-2006
1.50
Made left side wing jig
Details
       

 06-26-2006
2.00
Installed center wing spar
Details
       

 06-26-2006
0.50
Front wheel bottom bearing support
Details
     

 06-24-2006
2.00
Joined the Front and Rear fuselage
Details
       

 06-23-2006
1.50
Marked and drilled the pedals and brakes
Details
       

 06-22-2006
1.50
Setting up the toe brakes
Details
       

 06-21-2006
1.00
Rudder pedals
Details
       

 06-21-2006
1.00
Front fuse buttom stiffeners
Details
     

 06-20-2006
1.50
Started on front fuselage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.