Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
Zodiac 601 XL
Cowling
24 Logs Found
Date
Hours
Work Log Summary
Details
12-14-2007
0.5
Installed onto fuselage to mark blue stripe
Details
12-13-2007
2.0
Cowl in yellow and white
Details
12-12-2007
2.0
Repainted the cowl
12-10-2007
1.5
Had to rub back parts of the cowl
Details
12-04-2007
1.0
Lower cowl rubbed back
11-26-2007
1.5
Sanded back wheel spats and cowl
Details
06-05-2007
0.5
New camlocs
Details
04-01-2007
2.0
Ram duct baffels
Details
03-23-2007
1.0
Filled low points on cowl hatch
Details
03-21-2007
1.0
Cowl hatch release
Details
03-20-2007
2.0
Oil access door
Details
03-18-2007
1.5
Sanded back NACA duct
Details
03-18-2007
0.0
Naca duct installation
03-18-2007
1.5
NACA Duct
03-16-2007
0.0
Pictures of cowl hinge
02-22-2007
1.5
Installed right side camlocks
Details
02-21-2007
2.0
Bottom cowl to fuselage attachment
Details
02-20-2007
1.0
Counter sink and rivet cowl
Details
02-18-2007
3.5
Oil cooler
Details
02-18-2007
0.5
Cowl fitted using hinges
Details
02-17-2007
2.0
Oil cooler installation
Details
02-17-2007
2.0
Join top and bottom of cowl
02-15-2007
2.0
Trial fit of both halves
Details
02-14-2007
1.5
Started installation fo top cowling
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Zodiac 601 XL Home
All
Ailerons
Avionics
Baggage Tray
Brakes
Canopy
Center Fuselage
Centre spar
Cowling
Empennage
Engine
Fairing
Final Assembly
Firewall
Flap assembly
Flight testing
Front Fuselage
Fuselage
FWF
Instrument panel
Left Wing
Miscellaneous
Mounting Horizontal
Painting
Prop
Rear turtle deck
Shop Supplies
Test flying
Undercarriage
Undercarridge
Upgrade
Upholstery
Weight and Balance
Wheels and brakes
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.