KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
91 Logs Found 
 Date
Hours
Work Log Summary

Details

 02-28-2010
15.0
Center spar upgrade complete
Details
       

 02-21-2010
6.0
Remove center spar
Details
       

 02-14-2010
18.0
Wing upgrade right side
Details
       

 01-31-2010
4.0
Rivet wing structure closed
Details
       

 01-30-2010
3.0
Wing upgrade
Details
       

 01-29-2010
7.0
Spar/Wing upgrade
       

 01-23-2010
8.0
Wing upgrade
       

 11-29-2009
6.0
Spar upgrade
       

 11-29-2009
0.0
Spar upgrade
       

 11-29-2009
0.0
Spar upgrade
       

 11-28-2009
4.0
Spar upgrade
Details
       

 10-27-2008
3.0
Back drill tank ribs to Z brackets
Details
     

 10-26-2008
2.0
Tank brackets
Details
       

 05-12-2007
0.0
Checking wing installation.
Details
       

 05-12-2007
7.0
Checking wing angle
Details
       

 05-05-2007
0.0
Wings part 2
       

 05-05-2007
6.5
Trial fitted the wings
Details
       

 04-14-2006
1.0
Moved wing into its storage cradle
Details
       

 04-14-2006
4.0
Mounting aileron trim tab in left aileron
Details
       

 04-14-2006
2.5
Mounted the Aileron and Flap on the right wing
Details
       

 04-09-2006
2.0
Pop rivet the wing tip in place
Details

 04-08-2006
1.0
Sanded back the filler around the fiber glass wing
Details
       

 04-08-2006
5.0
Making the wing caddy
Details
       

 04-08-2006
2.0
Closing up the top of the wing
Details
       

 04-04-2006
2.0
Fitting the fibre glass wing tip
Details
       

 04-02-2006
4.0
Fuel tank flush fit filler cap
Details
     

 04-01-2006
6.0
Dimple top rear skin and fit filler cap
Details
       

 03-29-2006
2.0
Fit fuel sender and drill filler hole in wing skin
Details
       

 03-28-2006
2.0
Bending Fuel sender arm and drilling hole in fuel
Details
       

 03-27-2006
0.5
Stuck cork unto the outside of fuel tank
Details
       

 03-27-2006
0.5
Fuel tank squeezed into its home
       

 03-27-2006
1.5
Drilled holes for fuel vent and fuel quick drain
Details
       

 03-25-2006
1.5
Wing tip rear cover
Details
       

 03-25-2006
1.5
Wing tip rear cover
Details
       

 03-25-2006
4.0
Riveting bottom of nose skin to rear spar and fron
Details
       

 03-23-2006
1.5
Finial fitting of finger strainer cover
Details
       

 03-22-2006
3.0
Fuel tank finger strainer cover
Details
       

 03-19-2006
1.5
Pop riveted nose ribs
Details
       

 03-19-2006
3.0
Finger strainer access cover
Details
       

 03-18-2006
4.0
Turned wing over so that I could rivet the bottom
Details
       

 03-17-2006
2.0
Drilled top of spar with #20 drill and hung ailero
Details
       

 03-16-2006
1.5
Marking up coordinates for cutting wing tip
Details
       

 03-16-2006
0.5
Cut the top of the wing tip skin
Details
       

 03-15-2006
3.0
Strapping down the nose skin on the right wing
Details
       

 03-15-2006
1.0
Corrosion proofing bottom rear skin
Details
       

 03-14-2006
2.0
Aileron access cover and dimpling of RR#7-9
Details
     

 03-13-2006
1.5
Tie down hook and dimpling of RR#5-6
Details
       

 03-13-2006
0.5
Dimpleing RR#5 adn RR#6
Details
       

 03-12-2006
4.0
Dimple the bottom rear skin and nose skin trailing
Details
       

 03-12-2006
1.0
Cutting Aileron access cover
       

 03-11-2006
1.0
Marking the cutout for the aileron bell crank acce
Details
     

 03-08-2006
4.0
Right wing nose skin
Details
       

 03-07-2006
1.0
Wing on its nose
Details
       

 03-07-2006
1.5
Right wing upside down and being leveled
Details
       

 03-07-2006
3.0
Lining up and back drilling the bottom skin on the
Details
       

 03-06-2006
1.0
Rigth wing, adding the top rear skin
Details
       

 03-06-2006
2.0
Rear spar cut off
Details
       

 03-06-2006
3.0
Back drilling the rear right skin
Details
       

 02-19-2006
1.0
Rear spar back drilled and clecoed in place
       

 02-19-2006
1.0
Mounting the nose rings
       

 02-19-2006
1.0
Mounting ribs on either end of the spar
       

 02-19-2006
1.0
Marked and back drilled rear spar doubler
       

 02-19-2006
1.0
Drilled nose rib L angles and assembling the rear
Details
       

 02-19-2006
1.0
Assembling the rear ribs on the right wing
       

 02-18-2006
2.0
L angle stiffener brackets for wing walk on RR#1-4
Details
       

 02-18-2006
2.0
Aileron Control bracket
Details
       

 02-17-2006
1.0
Aileron control horn brackets
Details
     

 02-15-2006
3.0
Nose ribs and aileron bell crank
Details
       

 02-14-2006
1.0
Main wing spare, attach the tip extension
Details
       

 02-12-2006
4.0
Finishing left aileron
Details
     

 02-12-2006
2.0
Cutting the flex hinge and fitting a normal hinge
Details
       

 02-11-2006
3.5
Making 45 degree cut, back drilling.
Details
       

 02-10-2006
1.5
Flaps complete, marking out the Left aileron skin
Details
       

 02-09-2006
1.5
Left Flap disassemble, deburr dimple etc.
Details
       

 02-07-2006
2.0
Dimple and deburr flaps
Details
       

 02-06-2006
2.0
Left hand flap hinge
Details
       

 02-04-2006
2.0
Flap hinge
Details
       

 02-02-2006
1.5
Marking up, cutting and drilling left hand flap sk
Details
     

 02-01-2006
2.0
Marking up, cutting and drilling right hand flap s
Details
       

 01-31-2006
2.0
Marked up right hand flap skin
Details
       

 01-29-2006
2.5
Dimple, prime and rivet
Details
       

 01-25-2006
1.0
Dimpling
Details

 01-22-2006
0.5
Fitting control bracket
Details
     

 01-22-2006
2.0
Disassemble Aileron, deburr and dimple
Details

 01-22-2006
3.0
Aileron Hinge
Details
       

 01-21-2006
1.5
Fitting aileron end rib
Details
       

 01-20-2006
3.0
Pre-drilling ailreron skins
Details
     

 01-19-2006
2.5
Marking up aileron skins
Details

 01-19-2006
0.5
Aileron problem
Details

 01-18-2006
3.0
Working on incorrectly bent aileron
Details
     

 01-17-2006
2.0
Ailerons
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.