KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
33 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-21-2006
0.0
Wings in cradle
       

 05-21-2006
3.0
Attaching Flap and Aileron to left wing
Details
       

 05-20-2006
0.0
Mounted strobe and completed riveting wing tip
     

 05-19-2006
8.0
Wing Tip finishing
Details
       

 05-17-2006
2.0
Trimming I/B and O/B wing tips
Details
       

 05-15-2006
1.0
Trim I/B and O/B wing tips
Details

 05-13-2006
0.0
Fuel cap and nose skin fit
Details
       

 05-13-2006
4.0
Closing left wing
Details
       

 05-11-2006
1.0
Marked rear I/B adn O/B cutting lines
Details

 05-11-2006
1.0
Inspection of right wing, before closing wing skin
Details
       

 05-10-2006
1.0
Nose skin and fuel tank
Details
       

 05-10-2006
3.0
Nose skin and fuel tank
Details
       

 05-07-2006
2.0
Drilled nose skin and dimpled rear top skin
Details

 05-06-2006
2.0
Pulling the top nose skin into place and back dril
Details
       

 05-06-2006
1.0
Left wing front nose skin
Details
       

 05-03-2006
2.0
Fuel sender and hole in the side of the tank
Details
       

 05-02-2006
3.0
Fitted finger strainer support bracket and cover
Details
     

 04-30-2006
1.0
Fuel strainer access cover
       

 04-30-2006
3.5
Back drilled bottom nose skin and dimpled
Details
       

 04-30-2006
2.5
Attach nose ribs and hang nose skin
Details
       

 04-29-2006
3.0
Rivet bottom skin of left wing and install access
Details
       

 04-25-2006
0.5
Drilled hole for the pitot and static, mounted to
Details
       

 04-25-2006
6.0
Dimpled bottom skin and all the ribs
Details
       

 04-23-2006
1.5
Back drilled bottom skin and nose ribs
Details

 04-22-2006
2.5
Aileron access cover and tie down ring
Details
       

 04-20-2006
2.0
Added nose ribs and access hole
       

 04-19-2006
2.0
Rear bottom skin back drilled to #30 holes
       

 04-18-2006
2.0
Turned wing over and added bottom skin
       

 04-17-2006
2.0
Rear top skin in place on left wing
       

 04-17-2006
2.0
Finishing rear spar
       

 04-16-2006
3.0
Wing walk stiffeners and attachment of rear ribs
Details
       

 04-16-2006
4.0
Mounted rear spar
Details
       

 04-15-2006
4.0
Started all the preliminary stuff for the left win
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.