KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
Work Logs Found: 18
Category Work Time: 37 Hours
 Date
Hours
Work Log Summary

Details

 07-04-2010
3.00
Fuel lines and covers
       

 05-10-2008
1.00
Fitted the wing fairings
Details

 05-02-2007
2.00
Installed air vents over the top of the NACA ducts
Details
       

 04-28-2007
2.00
Installed step and fairings
Details
       

 03-30-2007
2.00
Step leg fairing
Details
       

 03-29-2007
1.00
Step fairing
Details
       

 03-28-2007
1.50
Installed wing step
Details
       

 12-16-2006
0.00
Picture of the fair leads keeping the cables apart
     

 12-16-2006
3.00
Installed control cables
Details
       

 12-16-2006
1.00
Installed Andair Fuel selector
Details
     

 12-16-2006
2.00
Elevator control cables
Details
       

 12-09-2006
5.00
More Painting
Details
       

 12-07-2006
1.00
Painted interior fuselage
Details
       

 12-05-2006
1.50
Center console side panels
Details
       

 12-04-2006
2.00
Re-install undercarriage
Details
       

 12-03-2006
3.00
Installed center console
Details
       

 08-21-2006
5.00
Centre Console and L angles
Details
       

 06-30-2006
1.00
Rear Spar attach bracket
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.