KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  4-1-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Ram duct baffels

This morning I decided that I wanted to try and finish with the Ram air ducts, so I installed the baffels to both the right and left ducts to direct air down onto the second cylinders, I also installed a vertical dam at the front of the right duct to stop air exiting under the front cylinder heads as suggested in the Jabiru installation instructions, left front duct still to be done.
' style=

Added a buffel for the second cylinder of the right duct

Added a buffel for the second cylinder of the right duct

' style=

Added a buffel for the front cylinder of the right duct

Added a buffel for the front cylinder of the right duct

' style=

Added a buffel for the second cylinder of the right duct

Added a buffel for the second cylinder of the right duct

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.