Powered By Kitlog Pro v2.0
Ron Web Site
RV-8
Fuselage
Work Logs Found:
82
Category Work Time:
279 Hours
Date
Hours
Work Log Summary
Details
03-18-2021
5.50
Panel Layout and Cutting
Details
03-16-2021
7.90
Pitch Servo, VS Forward Spar, Panel Layout
Details
03-15-2021
2.80
Pitch Servo
03-14-2021
3.00
Pitch Servo
03-13-2021
1.80
ELT Bracket
Details
03-12-2021
3.80
ELT Bracket
03-11-2021
2.20
ELT Bracket
Details
03-10-2021
2.30
Aileron Trim
03-08-2021
1.70
Aileron Trim
03-07-2021
4.70
Aileron Trim
03-01-2021
1.70
Aileron Trim
02-27-2021
1.60
Riveting the Aft Upper Skin
02-26-2021
1.80
Riveting After Upper Skin
Details
02-11-2021
1.80
Drift Pins, Drain Holes, Rear Skin
Details
01-25-2021
3.70
Baggage Door
01-24-2021
1.30
Baggage Door
01-23-2021
1.20
Baggage Door
01-22-2021
1.80
Brake Lines
01-19-2021
1.30
Static System & Air Vent
01-13-2021
2.50
Map Box Construction
01-11-2021
4.60
Map Box Prep, Gussets, Forward Fuselage Dimpling
01-05-2021
3.90
Forward Fuselage Top Skin
01-03-2021
8.10
Fuselage Bulkheads, Instrument Panel and Priming
Details
01-02-2021
4.20
Forward Upper Fuselage
Details
01-01-2021
1.70
Forward Upper Fuselage
Details
12-31-2020
2.70
Service Letter 00014
Details
12-30-2020
1.20
Service Letter 00014
Details
12-29-2020
2.60
Static System and Roll Bar
Details
12-27-2020
6.50
Aft Skin and Tie Down Storage
Details
12-15-2020
4.70
Elevator Rigging
Details
12-14-2020
2.50
Aft Skin
Details
12-13-2020
6.10
Aft Upper Skin
Details
12-11-2020
2.00
Aft Fuselage Skin
12-08-2020
3.70
Brake System
Details
12-06-2020
5.20
Brake System
Details
12-05-2020
2.00
Fuel System
Details
11-29-2020
5.20
Fuel System
Details
11-24-2020
7.60
Rudder Pedals and Fuel System
Details
11-21-2020
1.00
Priming
11-16-2020
1.20
Fuel Filter and Pump Brackets
Details
11-13-2020
5.20
Fuel Vent Lines
Details
11-12-2020
4.00
Fuel System
Details
11-11-2020
5.30
Rudder Pedals
Details
11-10-2020
3.40
Rudder Pedals
Details
11-08-2020
4.30
Rudder Cables and Rudder Pedals
Details
10-02-2020
2.90
Control Rigging
09-25-2020
2.00
Control Surface Rigging
09-24-2020
4.40
Elevator Control System
Details
09-23-2020
3.10
Elevator Control System
Details
09-15-2020
0.80
Control System
09-09-2020
2.40
Control System
09-08-2020
1.70
Control System
09-07-2020
1.00
Control System
09-04-2020
2.80
Priming
09-03-2020
1.80
Assembling F-841 Pushrod
Details
08-24-2020
3.80
Elevator Control System
Details
06-14-2020
2.80
Mounting the Vertical Stabilizer
06-04-2020
2.50
Mounting the Vertical Stabilizer
Details
06-01-2020
2.30
Mounting the Vertical Stabilizer
Details
05-25-2020
1.00
Mounting the Vertical Stabilizer
05-20-2020
2.30
Attaching the Empennage
Details
05-19-2020
3.00
Attaching the Empennage
Details
05-15-2020
5.80
Riveting Footwells and Making Cable Anchor
Details
05-14-2020
6.50
Riveting Rear Seat Back and Floors
Details
05-14-2020
0.00
Riveting Rear Seat Back and Floors
05-13-2020
3.10
Riveting Seats
Details
05-12-2020
6.20
Priming Fuselage Parts
Details
05-11-2020
7.30
Cockpit Preparation
05-08-2020
5.20
Fuselage Floors
Details
05-08-2020
0.00
Fuselage Floors
05-07-2020
2.90
Fitting the Flap Bearing Blocks
Details
05-05-2020
4.40
Floors and Baggage Area
Details
05-04-2020
3.70
Rear Seatback
Details
05-01-2020
1.10
Drilling Front Seatback
Details
04-24-2020
3.70
Landing Gear Installation
Details
04-22-2020
8.20
Fitting the Landing Gear
Details
04-21-2020
2.50
Drilling F-804N-1 Bulkhead Caps
Details
04-17-2020
2.70
Verifying QB Fuselage
Details
04-16-2020
6.80
Ensuring QB Fuselage is Complete
Details
04-15-2020
2.70
Ensuring Quick Build is Complete
Details
09-09-2019
9.00
Fuselage Inventory
Details
09-08-2019
3.80
Fuselage Inventory
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
325
1022
Electrical
2
38
Elevators
32
67
Empennage
8
20
Fuselage
82
279
Horizontal Stabilize
24
45
Rudder
22
33
Tools
1
2
Vertical Stabilizer
8
13
Wings
146
525
Copyright © 2001-2021 Matronics. All Rights Reserved.