Powered By Kitlog Pro v2.0
Ron Web Site
RV-8
Fuselage
11-11-2020
< Previous Log Entry
Next Log Entry >
Date:
11-11-2020
Number of Hours:
5.30
Manual Reference:
OP-3
Brief Description:
Rudder Pedals
Today I continued working on the rudder pedal installation. I assembled the entire rudder pedal assembly and then got it lined up on the floor of the fuselage. I then drilled all the holes to #30 that I had drilled in the rudder pedal angles.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
429
1380
Avionics
1
8
Electrical
2
38
Elevators
32
67
Empennage
8
20
Fuselage
179
600
Horizontal Stabilize
24
45
Miscellaneous
1
8
Rudder
22
33
Tools
1
2
Vertical Stabilizer
8
13
Wings
151
546
Copyright © 2001-2024 Matronics. All Rights Reserved.