I started out tonights session by measuring, marking and drilling two holes for rivets to act as static ports for the static system. The static ports are just forward of the F-809 bulkhead. After installing the rivets I knocked the mandrels out of them so they are hollow.
I then moved on to installing the roll bar. I final drilled the two holes on each side and then tried to temporarily mount the WD-814. It fit well side to side but I had to tweak the alignment of the flange on the right side so that the bolts would match up with the holes in the cockpit rails. I then temporarily installed bolts and clamped the forward portion down in preparation for drilling the bolt holes in the cockpit rails and longerons.