KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
Work Logs Found: 24
Category Work Time: 153 Hours
 Date
Hours
Work Log Summary

Details

 10-20-2019
3.50
Rivet lower cowling to bottom nosebowl
Details
     

 08-04-2018
45.00
Punchlist for engine Cowl removal
Details
       

 08-03-2018
2.50
Sand fiberglass parts
Details

 08-02-2018
4.50
Flox and micro fiberglass parts
Details
       

 07-31-2018
6.00
Worked on the smiley's at lower skin to nosebowl
Details
       

 07-31-2018
2.00
Made nosebowl re-enforcing strips
Details
       

 07-28-2018
3.00
Prep for Engine Cowl removal
Details
       

 07-15-2018
3.00
Lepinsky Cowl Lip
Details
       

 07-15-2018
4.00
Determine size and design of boot cowl outlet
Details
       

 07-14-2018
5.50
Cut and shaping of Cowl air intake opening
Details
       

 06-05-2018
6.00
Oil Door
Details
       

 04-16-2018
4.50
Right door install and carb mounting
Details
       

 04-15-2018
2.50
Right cowl door
Details

 04-14-2018
7.00
Second Lower Engine Cowling
Details
       

 04-13-2018
4.50
Firday the 13th - OOPS day!!
Details
     

 04-11-2018
4.50
More engine cowl
Details
       

 04-09-2018
6.50
Start on cowl right door
Details
     

 04-08-2018
5.50
Continued alignment and fit of lower engine cowl
Details
     

 04-07-2018
5.80
First fit of lower center section
Details
       

 04-06-2018
4.50
Making Template for lower engine cowl section
Details
       

 04-05-2018
8.50
How big should the engine cowling door be??
Details
       

 04-04-2018
6.00
Engine Cowl Top Center
Details
       

 04-03-2018
4.50
Initial fit of nosebowl
Details
       

 03-18-2018
3.50
Prep for engine cowling - installed engine
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.