Powered By Kitlog Pro v2.0
Crazy Canuck
Cozy MKIV
All
45 Logs Found
Date
Hours
Work Log Summary
Details
01-04-2012
3.0
Details
01-02-2012
3.0
Dam removal
Details
01-01-2012
12.0
Top spar cap layup
Details
12-27-2011
1.0
Details
12-19-2011
2.0
Shearweb Layup
Details
12-18-2011
7.0
Shear Web Layup
Details
12-04-2011
3.0
Hard Points
Details
11-27-2011
4.0
Tough cutting
Details
11-27-2010
8.0
Canard foam
Details
11-21-2010
2.0
Canard Jig
Details
11-20-2010
5.0
Building the Canard Jig
Details
11-14-2010
5.0
Clean Up
Details
10-31-2010
3.0
Trimmed the ends and removed from the jigs
Details
10-24-2010
4.0
Glassed the Landing Gear Attachement Area
10-23-2010
4.0
Filling the Landing Gear Attachement Area
Details
10-22-2010
3.0
Landing Gear Attachment Area
Details
09-11-2010
3.0
First lower longeron attachment.
Details
09-10-2010
6.0
Fiberglassing the upper longerons
Details
09-06-2010
6.0
Fuselage sides adding the upper longerons
Details
09-05-2010
6.0
Fuselage sides Part 4
Details
09-04-2010
6.0
Fuselage Sides Part 3
Details
09-03-2010
2.0
Fuselage sides Part 2
Details
09-01-2010
2.0
Fuselage sides Part 1
Details
08-31-2010
2.0
Longerons - Part 2
Details
08-29-2010
1.0
Longerons
Details
08-28-2010
6.0
Building the fuselage jigs and longerons - part 1
Details
08-15-2010
6.0
Upper forward landing gear bulkhead
Details
08-01-2010
4.0
Fiberglass Upper Forward Gear Bulkhead
Details
08-01-2010
0.0
Cutting out the Aft Landing Gear Bulkhead - Part 2
Details
08-01-2010
4.0
Cutting out the Aft Landing Gear Bulkhead - Part 1
Details
07-04-2010
8.0
Instrument Panel Bulkhead
Details
06-30-2010
2.0
F22 and F28 Bulkheads - Part 4
Details
06-28-2010
3.0
F22 and F28 Bulkheads - Part 3
Details
06-27-2010
2.0
F22 and F28 Bulkheads - Part 2
Details
06-26-2010
6.0
F22 and F28 Bulkheads - Part 1
Details
05-18-2010
2.0
Seatback Bulkhead - Trimming
Details
05-16-2010
4.0
Seatback bulkhead, side two
Details
05-15-2010
4.0
Seatback bulkhead, side one
Details
04-25-2010
4.0
Hardpoints for landing gear bulkheads.
Details
04-18-2010
4.0
Confidence Piece
Details
04-12-2010
2.0
Sheet of fiberglass test piece
Details
04-10-2010
5.0
Built a hot box for epoxy.
Details
12-26-2009
2.0
Started cutting templates for bulkheads
Details
10-03-2009
10.0
Built a worktable
Details
02-15-2008
1.0
The plans arrived
Details
SITE NAVIGATION
Cozy MKIV Home
All
00 - Contact Details
02 - Setup
03 - Education
04 - Bulkheads
05 - Fuselage Sides
10 - Canard
14 - Center Spar
Copyright © 2001-2013 Matronics. All Rights Reserved.