 04-27-2013
2.0
Stripped leading edge, set some rivets.
Details
       

 04-11-2013
1.0
Mag grease, generator.
Details

 03-07-2013
4.0
More structure repairs, top of left wing.
Details
       

 03-06-2013
2.0
Generator and magneto work.
Details
       

 03-04-2013
2.0
Generator and patch work.
Details
       

 03-03-2013
4.0
Worked on left wing repairs and cleaning.
Details
       

 03-02-2013
3.5
Began left wing structure repairs.
Details
       

 03-01-2013
3.0
Air filter, muffler bracket, generator bearing.
Details
       

 02-28-2013
4.0
Torqued down cover, disassembled generator.
Details
       

 02-26-2013
2.0
Installed gears and crankcase cover.
Details
       

 02-14-2013
4.0
Weighed pistons, lapped valves.
Details
       

 02-13-2013
4.0
Cleaned parts.
Details

 02-12-2013
4.0
Cam gear bolts missing.
Details
       

 02-09-2013
7.0
Stripped left wing.
Details
       

 02-07-2013
1.0
Mounted engine on stand.
Details
       

 02-06-2013
6.0
Mated case halves.
Details
       

 02-04-2013
4.0
Finished checking dimensions.
Details

 02-03-2013
4.0
Worked on wings.
Details
       

 02-02-2013
2.0
Checked dimensions cylinders 1& 2.
Details
       

 01-31-2013
7.0
Found bad pinion.
Details
     

 01-30-2013
5.0
Installed internal parts.
Details
       

 01-27-2013
6.0
Fabric Class Day 2
       

 01-26-2013
8.0
SportAir Fabric Class at OSH Day 1
       

 01-14-2013
6.0
Stripped aluminum from right wing.
Details
       

 01-09-2013
2.0
Ordered consumables.
Details

 01-08-2013
0.0
Odds and ends
Details

 01-01-2013
1.0
Removed one wing skin.
Details
       

 12-31-2012
1.0
Finished blasting last cylinder.
Details

 12-26-2012
6.0
Disassembled/cleaned cylinders.
Details
       

 12-19-2012
7.0
Assembled crank and connecting rods.
Details
     

 12-18-2012
5.0
Ordered hardware.
Details
     

 12-17-2012
3.0
Assembled oil pump.
Details

 12-13-2012
3.0
Cleaned mating surfaces.
Details
     

 12-12-2012
2.0
More preliminary tasks.
Details
       

 12-06-2012
1.0
Started spreadsheet.
Details
     

 12-04-2012
1.0
Organized parts.
Details
     

 12-03-2012
4.0
Finished elevators.
Details
     

 12-02-2012
4.0
Riveted trailing edges.
Details

 12-01-2012
3.0
Riveted right elevator, set up for laser.
     

 11-30-2012
5.0
Riveted left elevator to spar.
       

 11-29-2012
6.0
Continued work on elevators.
Details

 11-28-2012
1.5
Continued drilling elevator trailing edges.
Details

 10-19-2012
4.0
Made progress on right elevator.
Details
       

 10-12-2012
4.0
Continued work on right elevator.
Details

 09-27-2012
0.5
Prepped parts, visited Granville
Details

 09-26-2012
5.0
Fabbed elevator parts.
Details

 09-25-2012
0.0
Summer recess, some progress
Details
       

 07-03-2012
2.0
Built up new spar.
Details
       

 06-26-2012
5.0
Finished wing skin, cut out left elevator skins
Details
       

 06-25-2012
5.0
Worked on skin, got #4 cylinder piston out.
Details
       

 06-22-2012
5.0
Prepped/primed elevator parts.
Details
       

 06-06-2012
8.0
Catch up of several short sessions.
Details
       

 05-17-2012
1.5
Began left elevator rebuild.
Details
       

 05-15-2012
4.0
Finished rudder.
     

 05-14-2012
6.0
Lots of riveting on the rudder.
Details
     

 05-11-2012
2.0
Debured edges, started final assembly,
Details
       

 05-10-2012
6.0
Aligned trailing edges, drilled.
Details
       

 05-09-2012
4.0
Drilled rudder skins.
Details
     

 05-07-2012
1.0
Fabbed rudder strip, got cam verdict.
Details
       

 05-04-2012
6.0
Completed & primed all rudder parts.
Details
       

 05-03-2012
5.0
Finished rudder skins, worked other parts.
Details
       

 05-02-2012
6.0
Cut out rudder skins.
Details
     

 04-25-2012
5.0
Started working on rudder skins.
Details
     

 04-22-2012
1.0
Finished cleaning up spar parts.
Details

 04-20-2012
2.0
Disassembled rudder spar assembly.
Details
       

 04-18-2012
4.0
Completed crankcase disassembly.
Details
       

 04-17-2012
6.0
Continued disassembly.
Details
       

 04-16-2012
4.0
Continued Engine Disassembly
Details
       

 04-13-2012
4.0
Engine Disassembly
Details
       

 03-22-2012
2.0
Set up in shop, began disassembly.
Details
       

 03-21-2012
0.0
Mounted engine to stand.
Details
     

 03-16-2012
10.0
Finished and stored HS.
Details
       

 03-01-2012
2.0
Completed riveting of top HS skins.
Details
     

 02-25-2012
2.0
Worked on corrosion on right wing.
Details
       

 02-23-2012
4.0
Riveted top right skin.
Details
       

 02-22-2012
1.0
Began riveting leading edge.
Details
     

 02-21-2012
6.0
Worked on HS reassembly.
Details
       

 02-20-2012
2.0
Started riveting.
Details
       

 01-18-2012
5.0
Finished spar repair, primed all parts.
Details
       

 01-17-2012
3.0
Worked on spar repair.
Details
       

 01-16-2012
4.0
Finished skins, prepped for primer.
Details
     

 01-14-2012
6.0
Cut out all big skins, center skin, match drilled.
Details
       

 01-13-2012
5.0
Cleaned leading edge strips, cut out first skin.
Details
     

 01-12-2012
5.0
Removed all skeleton parts, cleaned.
Details
       

 01-11-2012
3.0
Removed center skins.
       

 01-06-2012
2.0
Removed remaining outer skins.

 01-05-2012
3.0
Removed HS skins.
Details

 01-04-2012
2.0
Finished HS Jig, started disassembly.
Details
     

 01-03-2012
2.0
Began work on HS.
Details
     

 01-02-2012
0.0
Inventoried parts and pieces
Details

 12-27-2011
2.0
Removed damaged rudder skins.
Details
     

 12-23-2011
2.0
Practiced rivet removal, began rudder disassembly.
Details
       

 12-22-2011
0.0
Cleaned parts, drilled a few rivets.
Details
       

 12-21-2011
0.0
Picked up the wings, tail, engine.
Details
       