Powered By Kitlog Pro v2.0
My Airplane Projects
C120
Engine
34 Logs Found
Date
Hours
Work Log Summary
Details
05-21-2013
0.0
Unwrapped/inspected prop.
05-17-2013
0.0
Prop arrived.
04-11-2013
1.0
Mag grease, generator.
Details
03-06-2013
2.0
Generator and magneto work.
Details
03-04-2013
2.0
Generator and patch work.
Details
03-01-2013
3.0
Air filter, muffler bracket, generator bearing.
Details
02-28-2013
4.0
Torqued down cover, disassembled generator.
Details
02-26-2013
2.0
Installed gears and crankcase cover.
Details
02-14-2013
4.0
Weighed pistons, lapped valves.
Details
02-13-2013
4.0
Cleaned parts.
Details
02-12-2013
4.0
Cam gear bolts missing.
Details
02-07-2013
1.0
Mounted engine on stand.
Details
02-06-2013
6.0
Mated case halves.
Details
02-04-2013
4.0
Finished checking dimensions.
Details
02-02-2013
2.0
Checked dimensions cylinders 1& 2.
Details
01-31-2013
7.0
Found bad pinion.
Details
01-30-2013
5.0
Installed internal parts.
Details
01-09-2013
2.0
Ordered consumables.
Details
01-08-2013
0.0
Odds and ends
Details
12-31-2012
1.0
Finished blasting last cylinder.
Details
12-26-2012
6.0
Disassembled/cleaned cylinders.
Details
12-19-2012
7.0
Assembled crank and connecting rods.
Details
12-18-2012
5.0
Ordered hardware.
Details
12-17-2012
3.0
Assembled oil pump.
Details
12-13-2012
3.0
Cleaned mating surfaces.
Details
12-12-2012
2.0
More preliminary tasks.
Details
12-06-2012
1.0
Started spreadsheet.
Details
12-04-2012
1.0
Organized parts.
Details
04-18-2012
4.0
Completed crankcase disassembly.
Details
04-17-2012
6.0
Continued disassembly.
Details
04-16-2012
4.0
Continued Engine Disassembly
Details
04-13-2012
4.0
Engine Disassembly
Details
03-22-2012
2.0
Set up in shop, began disassembly.
Details
03-21-2012
0.0
Mounted engine to stand.
Details
SITE NAVIGATION
Contact Builder
C120 Home
All
Elevators
Engine
Horizontal Stab.
Preparation
Rudder
Wings
RV-12 Home
Copyright © 2001-2013 Matronics. All Rights Reserved.