Date |
Hours |
Work Log Summary
 |
Details
 |
09-29-2006
|
18.0
|
Wheel Well Sealant Removal.
|
Details
|
|
|
04-22-2006
|
12.0
|
Main Landing Gear Assembly.
|
Details
|
|
|
04-05-2006
|
8.0
|
EAS Sequenced Gear Door System
|
Details
|
|
|
03-26-2006
|
8.0
|
Landing Gear Polishing.
|
Details
|
|
|
02-21-2006
|
6.0
|
Control Rod Interior Corrosion Treatment.
|
Details
|
|
|
12-09-2005
|
3.0
|
Control Rod Corrosion Treatment.
|
Details
|
|
|
11-16-2005
|
4.0
|
Horizontal To Vertical Tail Reinforcement Layups.
|
Details
|
|
|
11-08-2005
|
3.0
|
Vertical Tail Layups Applied.
|
Details
|
|
|
11-07-2005
|
2.0
|
Empennage Clean-up And Prep.
|
Details
|
|
|
11-06-2005
|
3.0
|
Horizontal Tail Repair - 2.
|
Details
|
|