Fit drill the straps to hold the oil tank. I riveted the lower strap to the lower baggage separation curtain. Match drilled the upper strap to the transition piece between the horizontal and vertical pieces, using the existing nutplates for attachment.
Additionally, I worked on the brake lines as the transition through the coverplates on the gear towers.
worked on the empanage fairing drilling final nutplat holes. I also sanded down the control cable exit fiaring.