KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  11-26-2019
Number of Hours:  4.00
Manual Reference:  Project relocation
Brief Description:  Project relocation from Las Vegas home to Hangar

Andy Lodewyck, Mark McCallister, and James Beck ---Great to have good people around who won't let you make a mistake.
This was one of the more stressful points of the project. Transporting the fuelage from our Las Vegas home to the hangar in Cal-Nev-Ari. While I thought this would be a one or two man event, it turned out that all 4 of us partisipated in moving the plane onto the trailer and securing the plane to the trailer in a way it could make the 75 mile journey from Sumerlin to Cal-Nev-Ari.

All three of these guys are professionals in their field of fabrication and installation of large structural steel in unique applications and they did not let me make a mistake. I handed them the tools and they secured the plane.

I came back with an enclosed trailer to move the other parts and wings which were in the cradle.

8'-4" from outside edge of horizontal stabilizer edge to edge.
' style=





' style=




' style=

from left to right (James Beck, Mark McCallister, Andy Lodewyck)

from left to right (James Beck, Mark McCallister, Andy Lodewyck)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.