Brief Description: Started to work on the turtle back assembly
Match drilled the rear bulkhead to the deck. Match drilled, deburred, dimpled, and riveted the nut plates on the bulkhead that are used for the rear access planel on the rear cargo area.
Clecoed in the two gussets on the 807 bulhead that mount to the rear longeron. Went to Lowes and picked up the two pieces of 3/4" plywood that will be used for the decking while accessing the rear section of the fueselage. Layout the cut lines.