KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  3-24-2018
Number of Hours:  9.00
Manual Reference:  Ctr Substructure
Brief Description:  Began the center substructure / bulkhead assembly

flute the uprights for the forward and aft bulkheads. Match drill the assembly Debur parts. D/A the parts to prep them for paint. Paint both forward and aft bulkhead verticals left and right for each.
Fabricate the mounting clip. (I had to fabricate it twice, since I drilled both holes on the first one and should have match drilled it to the bulkhead. Also fabricated the seatbealt lugs. preped and painted.
Riveted the nutplates for forward bulkhead and verticals. As well as the seat rail nutplates.

Bolted the forward bulkhead bolts and torqued to specification 85 inch pounds (AN 4 bolts)
' style=

Deburing parts

Deburing parts

' style=

D/A parts for paint prep

D/A parts for paint prep

' style=

Forward bulkhead with painted verticals

Forward bulkhead with painted verticals

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.