Date:  3-5-2018
Number of Hours:  6.50
Manual Reference:  Floor assembly
Brief Description:  Forward floor assembly

Finished up riveting the firewall assembly, except for the two uper corners (13) point that are asked to wait for further structure.

Began assembly of the floor. Debured the pieces and match drilled the assembly. (match drilled the nutplates and countersink the angle structure)