KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  5-10-2017
Number of Hours:  2.25
Manual Reference:  Leading edge
Brief Description:  Leading edge assembly and tanks

Finished riveting the leading edge to main spar assembly.

Attached hardware for Pitot tube to main spar/skin

Set tanks into place on main spar. Attached everyother screw in skin assembly to spar and doubler plate. Losly bolted in the ribs to main spar. (I'll have to go back and tourqe down the bolts to proper specification. I need to check on possibly safety wiring the bolts. I'm a little worried about vibration on the bolted connections inside the wing.
' style=

Leading edge riveted into place and tanks bolted in

Leading edge riveted into place and tanks bolted in

' style=

Left and right tank assemblies

Left and right tank assemblies

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.